Navigable aqueduct
The Edstone Aqueduct was opened in 1816 to carry the Stratford-upon-Avon Canal across a shallow valley of meadows, the railway, a road and a stream. This cast iron aqueduct's towpath is part of the iron trough, so pedestrians get a "duck's eye" view of passing canal boats. |
Contents |
[edit] Introduction
Navigable aqueducts (sometimes called water bridges or canal aqueducts) are structures that incorporate canals above other waterways, valleys or transportation infrastructure. Since they function as canals for transport, navigable aqueducts are generally wider than traditional aqueducts.
[edit] History
While elevated water bridges were used during by Roman Empire, aqueducts were not regularly used as transport systems until the 17th century, when modern canal systems were introduced as a form of transportation. In Great Britain, navigable aqueducts became an important part of the country’s industrial revolution.
However, water bridges in the sky were not popular with early canal builders who used masonry for their structures. The weight of the water, and the clay required to seal the canal trough well enough to ensure it was watertight, forced engineers to come up with exceptionally sturdy designs.
The Grade II listed Hazelhurst Aqueduct is an example of a masonry navigable aqueduct. This replacement aqueduct carries the Leek Branch of the Caldon Canal and was opened in 1841. |
[edit] Thomas Telford’s major water bridges
Attitudes towards navigable aqueducts changed with the introduction of cast iron troughs that were inherently rigid. These could be supported on streamlined pillars.
The 1795 Longdon-on-Tern Aqueduct in east central Shropshire is one of the earliest large-scale cast iron navigable aqueducts (only Benjamin Outram's Holmes Aqueduct on the Derby Canal pre-dates it.) Constructed by Thomas Telford, the Longdon Aqueduct is 57m long and is built across three intermediate piers. It was part of the Shrewsbury Canal system. Although it is no longer in operation, the Longdon Aqueduct and its towpath have been preserved and are designated as a Grade I listed structure.
One of Telford’s most important structures, the Pontcysyllte Aqueduct in Wales, was completed in 1805. Built on the Llangollen Canal over the River Dee valley, the Pontcysyllte Aqueduct is 307m long, 3.4m wide and 1.60m deep - making it the longest and highest aqueduct in the UK. (The Edstone Aqueduct over the Stratford-upon-Avon Canal is the longest in England, and the Avon Aqueduct over the Union Canal is the longest and tallest in Scotland.)
Telford took his time on the project, and asked his long-term colleague, Mathew Davidson, stonemason and civil engineer, to act as resident engineer for the construction of the masonry on the Pontcysyllte Aqueduct.
The Pontcysyllte Aqueduct, near Llangollen, Wales, carries the Llangollen Canal across the River Dee. |
While advanced in terms of its scale, its construction incorporated the ancient tradition of using mortar made from water, lime and ox blood to cement the masonry piers. This addition to the mixture followed a superstition that the blood of a strong animal would act as a strengthening agent.
To accommodate excessive rainfall, most large navigable aqueducts were built with overflow outlets that could control water levels. However, the Pontcysyllte Aqueduct (which is still operational and is on the UNESCO World Heritage List) also has a plug, which is removed every five years so the structure can be drained for cleaning and maintenance.
[edit] Three Bridges
Also known as Windmill Bridge, Three Bridges was built between 1856 and 1859. Designed by Isambard Kingdom Brunel, it was the last project he worked on before his death in 1859.
The two bridges over the railroad tracks each serve a different purpose. The central bridge supporting the Grand Junction Canal and the top supporting Windmill Lane. The structure is located in West London and is a scheduled ancient monument.
The Three Bridges navigable aqueduct conveys the canal through a pale blue cast-iron trough over the railway, with the road on a brick and cast-iron girder bridge above. |
[edit] Barton Swing Aqueduct
In 1893, Sir Edward Leader Williams was tasked with replacing a stone aqueduct from 1761 with something that could address the problem of large boats passing under. His Barton Swing Aqueduct, completed in 1894, was designed so it could pivot open for ships that needed to travel through the Manchester Shipping Canal.
Barton swing aqueduct is closed off at both ends, with two pairs of pivoting gates. |
Controlled from a brick tower situated on an adjacent island, a 71m section of the aqueduct can turn 90 degrees to allow the Bridgewater Canal to cross the newer shipping canal. The tower also manages a swinging road bridge nearby.
Barton swing aqueduct on the left and Barton Road swing bridge on the right. |
Dozens of navigable aqueducts survive in the UK, and many are still in operation.
The longest navigable aqueduct in the world is the Magdeburg water bridge in Germany. Built from 1997 to 2003, the 918m long structure spans the river Elbe and enables large commercial ships to pass between the Rhineland and Berlin.
An aerial view of the Kanalbrücke Magdeburg (Magdeburg water bridge) near Hohenwarthe, Germany. |
[edit] Related articles on Designing Buildings
- Aqueduct.
- Barrage.
- Bridge structures.
- Clifton Suspension Bridge.
- Funicular.
- Going the extra mile to extend the lifespan of the Menai Suspension Bridge.
- How canals work.
- John Rennie.
- Matthew Davidson stonemason and civil engineer.
- Pontoon bridge.
- Railway engineering.
- River engineering.
- Submersible bridge.
- Swing bridge.
- Water engineering.
- Waterway.
Featured articles and news
Tasked with locating groups of 10,000 homes with opportunity.
Open inquiry into the remediation of dangerous cladding
The committee wants to hear views in its call for evidence.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Refurbishment for net zero; the BSRIA white paper
The everyday practice of tackling energy efficiency, fabric first, ventilation, air quality, and occupant wellbeing.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.
Foundations for the Future: A new model for social housing
To create a social housing pipeline, that reduces the need for continuous government funding.
Mutual Investment Models or MIMs
PPP or PFI, enhanced for public interest by the Welsh Government.
Stress Awareness Week ends but employer legal duties continue.
A call to follow the five Rs for the business and for the staff.
Key points and relevance to construction of meeting, due to reconvene.
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.