COSHH
Many processes involve the use of substances that could cause harm. The Control of Substances Hazardous to Health Regulations 2002 (COSHH) require employers to prevent or reduce workers' exposure to substances including:
- Chemicals, and products containing chemicals.
- Fumes, gases, vapours and mists.
- Dusts.
- Nanotechnology
- Biological agents and germs.
It does not include lead, asbestos or radioactive substances, which are controlled by other legislation.
There are a wide range of situations where workers might be exposed to substances hazardous to health:
- Dusty or fume-laden air in welding, quarries or woodworking.
- Metalworking fluids.
- Flowers, bulbs, fruit and vegetables.
- Wet working such as catering and cleaning.
- Wet cement in construction.
- Benzene in crude oil.
- Using substances such as paint, ink, glue, lubricants, detergent and beauty products.
See HSE: Control of Substances Hazardous to Health Essentials guidance publications for guidance on different types of substances that might be encountered. This includes guidance on silica, welding and metalworking, plant and machinery and does in fact include guidance about asbestos.
Workers might be be exposed by:
- Inhalation.
- Ingestion.
- Contact with the skin.
- Contact with the eyes.
- Skin puncture.
Controlling hazardous substances involves:
- Identifying potential health hazards.
- Undertaking risk assessments to determine how to prevent harm. If an employer has five or more employees they must record risk assessments, but it is sensible to do this even if there are fewer than five employees.
- Providing control measures, ensuring that they are in good working order and that they are used.
- Providing, replacing and paying for personal protective equipment (PPE).
- Where appropriate, providing monitoring to show compliance with Workplace Exposure Limits (WELs) or Biological Monitoring Guidance Values (BMGV) or to show that control equipment or personal protective equipment is working properly.
- Where appropriate, providing health surveillance.
- Emergency planning.
- Providing information, instruction and training so that employees understand; what the hazards and risks are, if there is an exposure limit, the results of any monitoring of exposure or health surveillance and what to do if there is an accident or emergency.
In the first instance, preventative measures should be taken to; avoid the substance or process, substitute it with something safer, or use the substance in a safer form. If exposure cannot be prevented, then it must be controlled to ensure that the risk of harm is ‘as low as is reasonably practicable' (ALARP).
Where proposed work has a high risk, a ‘permit to work’ may be introduced to ensure that only authorised people carry out the work, within a specified time frame and in a specific way, which may be set out in a method statement.
[edit] Related articles on Designing Buildings Wiki
- CDM.
- Competent person.
- Construction dust.
- Construction health risks.
- Contaminated land.
- Deleterious materials.
- Design risk management.
- Designing to reduce the chemical, biological and radiological vulnerability of new buildings (IP 7/15).
- Disposal.
- Hazardous substances.
- Health and safety file.
- Health and safety.
- Health and Safety Executive.
- Injuries on construction sites.
- Mastic asphalt flooring.
- Method statement.
- Occupational health.
- Personal protective equipment.
- Planning (Hazardous Substances) Act 1990.
- Pollution.
- Pre-construction information.
- Principal contractor.
- Registration, evaluation, authorisation and restriction of chemicals REACH.
- Reporting accidents and injuries on construction sites.
- Risk assessment.
- Site waste management plan.
- Volatile organic compounds.
- Workplace exposure limits.
- Work at height regulations.
[edit] External references
- The Control of Substances Hazardous to Health Regulations Legislation.
- HSE: COSHH.
- HSE: Control of Substances Hazardous to Health Essentials guidance publications.
- European Regulation (EC) No 1272/2008 on classification, labelling and packaging of substances and mixtures (CLP Regulations).
- Registration, Evaluation, Authorisation & Restriction of Chemicals (REACH)
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Comments