Building integrated windpower
Building integrated wind power refers to buildings designed to harness wind energy on site, as opposed to wind turbines that harness energy off-site and then transmit that energy for use in the building or via the national grid.
This type of building often incorporates micro-wind turbines at the roofline of a building but may also incorporate larger wind turbines and aerodynamic forms to direct wind towards the turbines.
Whilst the traditional windmill is the clearest example of a building designing to harness the power of wind, there have been many conceptual and some built modern examples where whole structures relate to, or are dictated by, the forces of wind.
Whilst the benefits of localised wind power include a reduction in transmission losses and reduced financial and carbon operational costs, some of the issues relate to dealing with noise and wildlife concerns as well as balancing installation costs verses the benefits.
Contents |
[edit] Building mounted turbines
As wind speeds generally increase with height, roof mounted turbines are theoretically good solutions.
Both vertical axis and horizontal axis turbines have been proposed, designed and in some cases installed on buildings.
Vertical-axis wind turbines consist of two types, the Savonius and the Darrieus. A Savonius turbine is S shaped whilst the Darrieus turbine looks like a whisk with curved vertical blades. The advantage of vertical axis wind turbines is that they can benefit from wind coming in any direction, but there are some arguments to say they are less efficient because of their swept area. Research suggest vertical wind turbines are significantly quieter because of the reduction in swept area and they can sometimes be seen in urban locations on public facilities such bus-stops.
The horizontal-axis turbine is the more commonly seen turbine. Its production capability will depend on the swept area of the blades. It deals with wind direction by the inclusion of a tail that rotates the blades according to the wind direction. There are different design variations of horizontal turbines but they generally look very similar and can be easily installed on roof tops, mounted high on poles.
A further type of horizontal axis turbine, but not so common is the helical rotor blade, which is similar to an open tube shape with a number of horizontal blades that turn in a similar way to a water wheel.
[edit] Building integrated turbines
Whilst a variety of experimental turbines were developed in the 1970's and adaptations of these continue to appear as new products on the market today, their integration into architectural form has been relatively slow and to some extent problematic.
In 1993, the Tomigaya Turbine Tower Project by the Richard Rogers Partnership investigated building integrated turbines as the form was modified to increase the speed of prevailing winds through a space between the building and the lift tower. Turbines were placed in this space to generate electricity for the building and wind tunnel tests suggested, that on an average day 130 kilowatts per hour could be produced by the turbine system. The building was never built.
In 2010 the Strata tower building nicknamed the Razor was built, a 148 metre tower in Elephant and Castle, London with three large wind turbines at its head. The three turbines on the 42nd floor were estimated to provide 8% of the buildings electrical needs. Designed by Hamilton Architects the developer made a 'conscious decision to experiment' noting that the entire southern facade of the building would have had to be covered in solar photo-voltaics to generate the same amount of energy. However in the same year the building was nominated for the carbuncle cup and came under much criticism not only because the turbine seemed to spin rarely but also because of its level of social housing provision.
The Phare tower or lighthouse tower in Paris’ La Defense district was planned to be 71 floor green building which would have 18 large wind turbines at it top. Designed by architect Thom Mayne, it would have been completed in 2018 and would have been the tallest skyscraper in Paris and one of the tallest in the European Union, but the project was cancelled.
Whilst the initial plans for New York’s Freedom Tower, or One World Trade Centre had significant wind power installation, it was built without it. As too was the Liverpool Edge building and the Spiracle Tower by Make Architects.
The Bahrain World Trade Center (Bahrain WTC or BWTC) is a 240-metre-high completed building that houses 3 x 225 kW wind turbines at it centre. The two towers are designed to funnel wind from the Persian Gulf in the north through the gap to provide accelerated wind over the turbines. The wind turbines were expected to provide 11% to 15% of the towers' total power consumption. The three turbines were turned on for the first time on 8 April 2008.
A professor of Building Physics at TU/e, Bert Blocken, noted however “Ideas about wind flows are often based on intuition, but that leads to suboptimal designs.” Using precise wind tunnel measurements and computer simulations on a model of the Bahrain WTC, Blocken calculated that the towers would actually produce 14 percent more wind energy if they were positioned the other way round. Or better still, suspending the wind turbines further back would have given a 31% higher energy output per year. But that is no fair comparison, says the researcher. “Because of constructive and financial reasons this option isn’t realistic.”
[edit] Building integrated micro-turbines
The RidgeBlade® Wind Turbine is an combination of microgeneration and building integration as it is a horizontal wind turbine system that can be installed within the ridge line of a roof.
The company states: "Using the existing surface area of a pitched roof, the RidgeBlade® collects and focuses the prevailing wind harnessing the Aeolian wind focus effect. This is where the wind is forced to travel over the roof surface and forms a pinch point at the roof ridge, accelerating the airflow through the turbine. As a result, measured wind speed around the ridge can be just over three times the actual wind speed. Placing the turbine in this high flow area means that up to nine times the energy is available to it compared to a HAWT (Horizontal Axis Wind Turbine) system."
For further information visit: https://thepowercollective.ca/how-it-works/
[edit] Related articles on Designing Buildings
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.