Arbitration in the construction industry
Arbitration is a private, contractual form of dispute resolution. It provides for the determination of disputes by a third party arbitrator or arbitration panel, selected by the parties to the dispute. Disputes are resolved on the basis of material facts, documents and relevant principles of law.
The arbitration process is administered by an appointed arbitrator subject to any relevant contractual rules and subject to the statutory regulatory framework applied by the domestic courts. There are only limited rights of appeal and legal costs are usually awarded to the successful party.
English law does not insist on any formal requirements for an arbitration agreement (for example it can be verbal), however if the agreement is not in writing it will be outside the supervisory regime of the courts established by the Arbitration Act.
Arbitration clauses are traditionally found in all standard form contracts used in the UK, often with related adjudication clauses (for example, JCT 16, and ICE 7th Edition (now withdrawn in favour of NEC3)). In the last few years there has been a tendency to set the dispute resolution default at litigation rather than arbitration, leaving the parties to specifically agree to arbitration.
Arbitration commences with a notice to concur which provides for agreement on the appointment of an arbitrator, failing which an arbitrator may be appointed by a nominating body (which should be named in the contract). Arbitration is now usually combined with adjudication and mediation in tiered dispute resolution procedures.
For information on the process of arbitration, see How does arbitration work?
Advantages:
- It is private - there is no public record of any proceedings, although not necessarily confidential.
- Speed, although this depends very much on the manner in which the arbitrator conducts the arbitration.
- The parties can agree on an arbitrator with relevant expertise in the matter. The arbitrators award can be enforced as a judgement of the court.
Disadvantages:
- The parties must bear the costs of both the arbitrator and the venue.
- Sometimes arbitration simply mimics court processes and so you do not get the advantage of informality and speed.
- Limited powers of compulsion or sanction if one party fails to comply with directions of the arbitrator, which can significantly slow down the process.
- The arbitrator has no power to make interim measures, such as for the preservation of property.
- Limited appeal rights.
For information on becoming an arbitrator, see How to become an arbitrator.
[edit] Related articles on Designing Buildings
- Adjudication.
- Alternative dispute resolution.
- Alternative Dispute Resolution legislation.
- Arbitration Act.
- Arbitration panel.
- Arbitration v Adjudication.
- Breach of contract.
- Causes of construction disputes.
- Conciliation.
- Construction Industry Model Arbitration Rules CIMAR.
- Contract claims.
- Dispute resolution.
- Dispute resolution boards.
- Dispute resolution procedure.
- Evaluation of claims.
- Expert determination.
- Expert evaluation.
- Housing Grants, Construction and Regeneration Act.
- How does arbitration work?
- How to become an arbitrator.
- Joinder.
- Mediation.
- Pay now argue later.
- Pendulum arbitration.
- Provisional relief.
- The role of the mediator.
- Scheme for Construction Contracts.
- Without prejudice.
[edit] External references
- ICE contract.
- JCT contract.
- FIDIC contract.
- JCT/CIMAR: Construction Industry Model Arbitration Rules.
- PACE: Guide to the Appointment of Consultants and Contractors P549 and 384
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.