Anodising
Anodising is an electrochemical process that converts a metal surface into a decorative and often protective anodic oxide finish. The anodic oxide structure is made up of a layer of metal oxide on the surface which slightly increases the thickness of the metal. The oxide is not attached to the surface like a paint or plate but is fully integrated with the underlying substrate, which helps to stop chipping or peeling. It also has a porous structure which allows for further processing such as colouring and sealing.
Aluminium is ideally suited to anodizing, although other nonferrous metals, such as magnesium and titanium, also can be anodized. The anodic oxide structure originates from the aluminium substrate and is composed entirely of aluminium oxide
Anodising is a process of controlled oxidation (in effect the same process as rusting). It involves a tank where aluminium is immersed into an acid electrolyte bath, a cathode is mounted to the inside of the tank and an electric current is passed through the aluminium. As this happens the aluminium acts as an anode, causing oxygen ions to be released from the electrolyte and combine with the aluminium atoms at the surface of the part being anodized, this creates a thickened, protective, integrated layer.
[edit] Related articles on Designing Buildings
- Aluminium.
- Brass.
- Brittle fracture.
- Corrosion coupons.
- Corrosion inhibitor.
- Corrosion resistance.
- Corrosion resistant alloy CRA.
- Crevice corrosion.
- Deterioration.
- Electrochemistry.
- Electrochemical cell.
- Failure of cast iron beams.
- Galvanised steel.
- Galvanic corrosion.
- Graphitisation.
- Guidance for construction quality management professionals: Structural Steelwork.
- Hydrogen embrittlement.
- Iron.
- Marine corrosion.
- Microbiologically influenced corrosion.
- Pitting.
- Rust.
- Steel.
- Stainless steel.
- Types of metal.
- Types of steel.
- Under-deposit corrosion.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.