Construction site records and registers
Construction sites are complex, continually changing and potentially dangerous. Ensuring they are efficiently and effectively managed and that they remain safe requires meticulous record keeping.
Some of the records and registers kept on site may be required by statutory bodies such as the Health and Safety Executive (HSE), or the building control body, others may be maintained for the convenience of the contractor.
Records that are kept on site might include:
- Accident book.
- Asbestos register.
- Asset register.
- Construction phase plan.
- Contract register.
- COSHH data and assessment sheets.
- Dangerous and explosive substances register.
- Details of underground and overhead services.
- Emergency plans.
- Existing health and safety files.
- F10 form.
- Fire equipment inspection register.
- Scaffolding register.
- Test records and certificates.
- LOLER Inspection register (Lifting Operations and Lifting Equipment Regulations).
- Manual handling assessment (MAC).
- Plants checks.
- Records of excavation inspections.
- Records of inspections of scaffold, working platforms and so on.
- Records of permits to work.
- Risk assessments and method statements.
- Safety equipment registers.
- Site induction and training registers.
- Site rules.
- Site visitors book.
- Site Waste Management Plan.
- Verification of competence, such as Construction Skills Certification Scheme CSCS cards.
[edit] Related articles on Designing Buildings
- Accident book.
- Accident report.
- Asbestos register.
- Asset register.
- Construction phase plan.
- Contract register.
- COSHH
- Health and safety file.
- F10 form.
- Manual handling.
- Mobilisation.
- Permit to work
- Risk assessments and method statements.
- Site induction
- Site rules.
- Site Waste Management Plan.
- Types of register.
Featured articles and news
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
Comments
To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Construction site records and registers are important documentation tools used to record and track various aspects of a construction project. They serve as a means of communication, evidence of compliance, and reference for future use. Here are some common types of construction site records and registers:
1. Daily Construction Log: This log is maintained on a daily basis and records activities, weather conditions, workforce attendance, equipment used, and any significant events or incidents that occur on the construction site.
2. Material Receiving Register: This register tracks the receipt of construction materials on the site. It includes details such as the date of delivery, supplier information, quantity received, and any discrepancies or issues observed.
3. Inspection and Test Records: These records document the inspections, tests, and quality checks conducted during various stages of construction. They may include records for concrete testing, soil testing, structural inspections, electrical inspections, and more.
4. Workforce Attendance Register: This register records the attendance of workers on the construction site. It helps track the number of workers present, their working hours, and any leave or absences.
5. Site Safety Records: These records focus on documenting safety-related activities and incidents. They may include records of safety meetings, safety inspections, accident reports, near-miss incidents, and safety training conducted on-site.
6. Change Order Log: This log tracks any changes or modifications made to the original construction plans or scope of work. It includes details such as the date of change, reason for change, parties involved, and impact on cost or schedule.
7. Equipment Maintenance Log: This log records the maintenance and servicing of construction equipment and machinery. It helps track the maintenance schedule, repairs, and any issues observed.
It's important to note that the specific records and registers maintained on a construction site may vary depending on the project requirements, local regulations, and the policies of the construction company or project owner.
Thanks, that seems to be more of an article than a comment, feel free to create a new article under a related title..
If you did not write the comment or article yourself though, please to list a reference or source who did. Thanks.