Ambient loop heat pump system
BG 34/2021, The Illustrated Guide to Renewable Technologies, 2nd edition, written by Michelle Agha-Hossein and David Bleicher and published by BSRIA in 2021, states: ‘An ambient loop heat pump system, also known as a water loop heat pump system, consists of a network of pipes that distribute water around the building at close to indoor ambient temperature. Each room or zone has one or more terminal units which are in effect small water-to-air heat pumps. These use the ambient loop as a heat source when heating is required in that zone or as a heat sink when cooling is required in that zone. This enables heat recovery – heat rejected from zones that require cooling is effectively recycled to zones that require heating. Simultaneous demand for heating and cooling in the same building is common – for example when one side of a building is subject to solar gain but the other side isn’t, or when there is heat loss through walls and windows of rooms around the perimeter of the building but heat gain from people and equipment in rooms at the core of the building.’
--BSRIA
[edit] Related articles on Designing Buildings
- Absorption heat pump.
- Air source heat pumps.
- Earth-to-air heat exchangers.
- Exhaust air heat pump.
- Ground source heat pumps.
- Heat pump.
- How to correctly size an ambient loop heat network using diversity factors.
- Hybrid heat pump electric panel heating.
- Room-based heat pumps.
- Solar-assisted heat pump.
- Water source heat pumps.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.