Water heating systems in dwelling are typically:
- From central heating with hot water cylinder: the central heating provides hot water for space heating while also providing hot water via a separate storage cylinder.
- From central heating (no hot water cylinder): the central heating provides hot water for space heating and can provide hot water on demand negating the need for a storage cylinder, therefore requiring less space.
- Immersion heater: an electric element heats water in a storage cylinder, used solely for hot water (not for central heating).
- Instantaneous: hot water heated as needed by an appliance (not a boiler) fuelled by for example gas or electricity.
- Dedicated boiler: hot water supplied from a boiler only used for hot water (not central heating).
Ref English Housing Survey, Energy efficiency, 2018-19, published by the Ministry of Housing, Communities & Local Government in July 2020.
[edit] Related articles on Designing Buildings
- Building services.
- Combustion plant.
- Domestic boiler market 2019.
- Heat pump.
- Heating controls.
- Heating large spaces.
- Heating.
- Hot water.
- Hot water safety.
- HVAC.
- Low carbon heating and cooling.
- Pipework.
- Radiant heating.
- Radiator.
- Thermostat.
- Types of heating system.
- US water heating market update 2021.
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.