Suppliers for design and construction
In the construction industry, ‘supplier’ (or economic operator) is a very general term which refers to organisations contracted as part of the delivery of a built asset.
Traditionally, suppliers might have been considered to be organisations contracted to provide physical supplies such as goods, materials, plant, and so on, however, its use is now much broader and PAS 1192-2 (now replaced by BS EN ISO 19650) defines a supplier as any ‘…provider of services or goods either directly to the employer or to another supplier in a supply chain’. The 'supply chain' is the interconnected hierarchy of suppliers.
As construction has become more complex, and suppliers have become more specialist, so the supply chain has extended. On a straight-forward 'traditional' building project, design consultants and the main contractor, sometimes referred to as tier 1 suppliers, work for the employer, and the main contractor may have a limited chain of their own suppliers.
However, on PFI or design and build projects, there may be just one first tier, or principal supplier, with wide range of consultants, sub-consultants, and sub-contractors working for them. The situation becomes more complicated on large projects when the employer has several tier 1 suppliers, all with extended supply chains. This may cascade down to a plethora of suppliers sometimes unknown to management at the top of the chain.
One of the difficulties encountered in the construction industry is that the first and second tier of the supply chain often sign-up to fairly onerous contract conditions but as the chain develops, so the contractual liabilities decrease until suppliers at the end of the chain may not be ‘locked in’ at all.
BIS Research paper No. 145, Supply Chain Analysis into the Construction Industry, A Report for the Construction Industrial Strategy, published by the Department for Business Innovation and Skills in October 2013 assessed five projects ranging in value from £1 million to £25 million.
It defined suppliers as:
The report suggests that, ‘Tier 1 contractors are typically termed main contractors, and many tier 2 contractors are described as specialist contractors. Labour-only sub-contractors typically operate at the third tier.’
It found that it was not uncommon to have 50 to 70 tier 2 suppliers and sub-contractors and suggested that the, ‘…duplication of multiple layers of profit, overhead and risk could represent a source of non-value added cost and waste.’
In recent years, larger employers offering continuity in construction have taken an increasing interest in establishing relationships beyond direct, first tier suppliers. Framework contracts and partnering agreements have pioneered this approach, encouraging the involvement of selected suppliers at relatively early stages of projects while offering continuity of work. This has led to greater collaboration between lead designers, contractors, specialist designers and specialist suppliers.
[edit] Related articles on Designing Buildings
- Code for Construction Product Information CCPI.
- Contractor vs supplier.
- Critical service contracts.
- Critical suppliers.
- Fragmentation of the UK construction industry.
- Indirect supplies.
- Integrated supply team.
- Key suppliers.
- Main contractor.
- Manufacturer.
- Named specialist work.
- Nominated supplier.
- Novation.
- PAS 1192-2.
- Partnering.
- Point of supply.
- Products v goods v materials.
- Public sector dependent suppliers.
- Reserved contract.
- Service provider.
- Spark framework RM6094.
- Subcontractor.
- Supply.
- Supply chain integration.
- Supply chain management.
- Tier.
- Tier 1 suppliers.
- Tier 2 and tier 3 suppliers
- Types of contractor.
- VAT reverse charge.
[edit] External references
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.