Stakeholder map
The term 'stakeholder' refers to anyone that has an interest in a project and can influence its success. Stakeholders may be able to help a project succeed, or to prevent it from happening.
Examples of stakeholders include:
- Members of the client organisation (such as user panels, champions and department heads).
- Other user groups (such as customers, residents, occupants, and visitors).
- Neighbours and community groups.
- Funders and shareholders.
- The local authority.
- Other statutory and non-statutory authorities.
- Special interest groups.
- Suppliers.
- The emergency services.
- Statutory utilities.
- Heritage organisations.
Stakeholder mapping is a systematic approach to managing relationships with stakeholders to ensure that the positive impacts of stakeholders are maximised and negative impacts are minimised.
As stakeholders can influence the success of a project, it is very important that they are identified as early as possible and that their potential influence is systematically assessed. This might include an assessment of:
- The likely impact of the project on the stakeholder.
- The issues that they will have an interest in.
- Their likely position.
- Their ability to influence the project.
- Their potential impact on the project.
- Potential mitigating actions.
Stakeholder assessments are complicated by the fact that stakeholders may not all have the same objectives.
A first step in considering how to interact with different stakeholders can be the preparation of a stakeholder map or stakeholder matrix. This might categorise stakeholders as potential advocates that can help make the project happen, indifferent stakeholders, or opponents that may try to prevent it happening. They might then be assessed in terms of their potential influence on the project, the consequences of that influence on the project and the potential for changing their position (for example their willingness to engage in dialogue).
Resources are best targeted at stakeholders with a strong potential to influence the project, the consequences of which would be serious, but where there is a good possibility of changing their position.
A stakeholder management plan sets out the strategy for engaging with (or perhaps not engaging with) each stakeholder. It will allocate responsibility for that engagement, define the form that the engagement will take and what it is intended to achieve, as well as setting out how that engagement will be monitored and how any feedback will be processed. A stakeholder management plan should also include contact details for stakeholders and may include other background information.
Preparing a stakeholder management plan should not be a paper exercise, but should be a genuine process of understanding motives, building relationships and support, minimising risks and maximising opportunities. The stakeholder management plan should be kept up to date, and stakeholders should be kept informed about developments on the project.
A variety of communicating methods can be used to help stakeholders properly understand the project (such as models and visualisations) and a variety of consultation methods can be adopted:
- One to one consultations.
- Meetings.
- Focus groups.
- Questionnaires.
- Exhibitions and open-days.
- Workshops.
- Websites.
- Printed materials.
- The use of specialist toolkits.
[edit] Related articles on Designing Buildings Wiki
- BREEAM project delivery stakeholders.
- Champions.
- Collaborative practices.
- Consultation process.
- Design quality.
- Design review.
- Early BREEAM stakeholder engagement.
- Projectisation.
- Project roles table.
- RACI matrix.
- Risk management.
- Risk register.
- Stakeholder management.
- Stakeholder management: a quality perspective.
- Stakeholders.
- Statutory authorities.
- Third party dependencies
- User panels.
[edit] External references
- OGC: Category management toolkit, Stakeholder management plan.
- Buro Happold: File:A Rough Guide to Stakeholder Mapping.pdf. Reproduced with permission.
- Stakeholdermap.com
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
Comments
Thank you for this great article and for using stakeholdermap.com in your research. We have recently updated our article on stakeholder engagement http://www.stakeholdermap.com/stakeholder-engagement.html. It might be useful to your readers.