Common spelling mistakes in the construction industry
The range of documents that need to be written in the construction industry includes:
- Technical and design reports.
- Legal documents (appointments, contracts, warranties and so on).
- Marketing documents (websites, case studies, brochures and books).
- Bid and tender documents.
The spell-check function on computers means that many common problems with spelling have been eliminated. However, some words remain troublesome, some have confusing homophones (words which sound the same but have different meanings) and some have US spelling variants. Spelling mistakes can create a negative impression of a company and undermine other work that has been done.
A number of the most common difficulties are listed below.
- affect: means to influence something, effect is to bring about change, or the result of change (to affect the environment, the effect of water damage).
- and: write in full, avoid using & and + unless it forms part of a company name.
- annex: verb (to annex), the noun has an extra e (we added an annexe to the building).
- artefact: not artifact.
- brownfield, greenfield and greenbelt: not brown field, green field, green belt.
- capitalise not capitalize: realise not realize, customise not customize, keep the ‘s’ in UK text.
- compliment and complement: to compliment is to offer praise, to complement means to complete, to create harmony or compatibility. The client complimented our work. The colour of the seats complemented the natural wood of the ceiling.
- discreet, discrete: discreet means to be tactful or prudent; discrete means separate.
- disinterested, uninterested: disinterested means impartial, uninterested means lacking in interest.
- effectively: not affectively.
- ensure, insure: ensure is to make sure of something, insure is related to insurance.
- everyday and every day: an everyday occurrence, we do this every day.
- focused, focusing: not focussed and focussing.
- forward, foreword: to travel forward, a foreword is introductory text in a book.
- fulfil: not fulfill. But infill, not infil.
- greywater: not grey water, also blackwater, rainwater.
- inquiry: this relates to an event such as a public inquiry. An enquiry is something you make when you ask a question/enquire.
- less and fewer: less applies to quantities such as volume, mass or area, fewer relates to numbers. Generally you can’t count/numerate less, but you can fewer - less water, fewer apples. Note that less/fewer are comparatives and usually require qualification; less or fewer than what?
- licence and license. Licence is a noun, wheras license is a verb.
- maybe, may be: maybe we should consider an alternative, this may be it.
- none: a commonly used abbreviation of ‘not one’ which is treated as a singular.
- pavilion: not pavillion.
- practice and practise: practice (with c) is a noun, such as an architectural practice. Practise (with s) is a verb or doing word, such as to practise. You can hear the difference with a similar word - to advise and to offer advice.
- principle and principal: a principle is a general rule, a principal is a senior manager or the main thing.
- rainwater or rain: not rain water.
- receive, conceive, deceive: - i before e except after c.
- recommend: not recomend.
- separate: not seperate.
- stationery, stationary: stationery is papers and pens, stationary is to stop still.
- until: not ‘til or till.
- would have: not would of.
This article was written by --Alex Harvie 17:57, 2 July 2013 (BST)
[edit] Related articles on Designing Buildings
- Architectural publishing.
- Brand guidelines.
- Common mistakes on building drawings.
- Getting published.
- Self publishing for architects.
- Symbols on architectural drawings.
- Technical notes on architectural publishing.
- Writing technique.
[edit] External references
- RIBA Good Practice Guide: Marketing your practice.
- The Author’s Society is a membership organisation which provides useful resources and fact sheets as well as an advice service.
Featured articles and news
A call for prevention and sensitive re-use.
The CIAT principal designer register
Providing assurance and verification of the capability and competence of registered ATs.
Building Safety recommendations and Northern Ireland
The NI roadmap to improving safety in high rise residential.
BSA residential sector competence standards guidance
BSAS 01:2024 Organisational Capability Management System Standard - Competence Assurance.
Specifying rendered external wall insulation for fire safety
How to interrogate the evidence provided to the specifier.
The benefits of writing articles for your organisation
How to create a profile for your organisation and publish for free.
No Falls Week. The importance of safe working at height
What to expect and what is on offer to avoid accidents.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.
A forward thinking, inclusive global community of members.
From engineered product life-spans, to their extension.
Circular economy in the built environment
A brief description from 2021. Where are we now?
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.
How about 'appraise' and 'apprise'? No less in construction than other walks of life, we appraise someone of something when we meant to apprise them.