Self-build home: Find a plot
Find potential plots.
Finding a suitable plot (or property for conversion) is one of the biggest challenges for self-builders as demand generally exceeds supply. It might involve:
- Advertising.
- Registering with estate agents, land agents and local authorities.
- Using online search sites such as PlotBrowser and Rightmove.
- Offering a finder’s fee to property professionals.
- Joining a self-build forum.
- Considering land or property owned by family members.
- Approaching owners of land designated for residential use in local development plans.
- Analysing aerial photography and large-scale maps which might reveal potential infill plots, such as; large back gardens, waste ground or brownfield sites.
- Poorly built, low-value properties that might be worth purchasing for their land value.
Be aware that there are a number of scams that attempt to exploit people looking for self-build plots. Always keep in mind the phrase ‘buyer beware’. If it sounds too good to be true, then it probably is.
Assess potential plots.
In considering different potential plots, it is important to assess:
- Compatibility with the requirements set out in the brief.
- The likelihood that planning permission will be granted, including possible objections from interested parties. Some sites are offered with outline planning permission, and without this, or detailed planning permission, the site may not be a developable plot. Proceeding with such a plot is taking a risk that the vendor did not consider worthwhile. However, plots with permission in place are likely to be more expensive.
- The date of any planning consent. Construction of a development must begin within three years of a planning approval, and reserve matters applications (applications giving details following an outline planning permission) must be made within three years of the outline approval.
- The planning history of the plot.
- Uses of adjoining land.
- Future developments planned in the area that might impact on the proposed plot.
- The connectivity of the location in terms of; transport links, access to schools, shops and other amenities.
- The exact legal boundaries of the plot.
- Ease of access onto the plot, both for construction vehicles and once the home is complete.
- Site orientation relative to the sun, views, prevailing wind and so on.
- Land topography, levels and flood risk.
- Availability or proximity of utilities. The cost of bringing utilities to a site will depend on the distance from existing connections and can be very expensive.
- Price in relation to the budget, including stamp duty land tax.
- Legal complexities, such as listed buildings, conservation areas, boundary disputes, party walls, easements, restrictive covenants, tree preservation orders and so on. See Technical due diligence for more information.
- The presence of protected species such as great crested newts or controlled species such as Japanese knotweed which can delay developments and incur significant costs.
- Obstructions such as old foundations which may need to be removed.
- Whether there is any contaminated land.
- The suitability of ground conditions for supporting a building and for landscaping.
- The possible layout of accommodation on the site.
- The likely value of the completed development.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February