Single Procurement Document (Scotland)
Contents |
[edit] Introduction
The Single Procurement Document (Scotland) - also referred to as SPD (Scotland) - is a document that contains questions used at the selection stage for procurement exercises published after 11 p.m. on 31 December 2020. It allows buyers to ask questions to identify suitably qualified and experienced bidders.
[edit] SPD (Scotland) vs ESPD (Scotland)
Scotland stopped using the European Single Procurement Document (ESPD) as a result of the UK's exit from the EU. Information for contracts entered and saved on the ESPD (Scotland) prior to the changeover is still applicable to SPD (Scotland).
The SPD (Scotland) questionnaire has slight changes from ESPD (Scotland). One change is the removal of the phrase “member states" from the terminology used throughout the document.
[edit] The SPD (Scotland) process
The Supplier Journey portion of the Scottish Government’s procurement guidance website offers an overview of the procurement process, including this brief explanation of key steps:
- The procurement officer will determine which standard SPD (Scotland) questions are required for their procurement.
- The procurement officer will include any minimum requirements and additional information on the questions asked in either the SPD (Scotland) online PCS Module or in the Contract Notice.
- The Contract Notice is published via Public Contracts Scotland (PCS) by the procurement officer.
- The Contract Notice will contain links to all documents required, including the SPD (Scotland).
- The supplier decides whether to submit a bid.
- The supplier must complete the appropriate format of the SPD (as specified by the procurement officer and outlined above).
- The procurement officer will normally only request evidence/certification before Contract Award to the one supplier.
[edit] Additional guidance
Under certain conditions, the SPD (Scotland) can be issued to bidders within a tender document or before the tender document is issued (if it is the first stage of a two stage procurement procedure). Publishing notices are still posted on Public Contracts Scotland (PCS) as required under the Procurement Reform (Scotland) Act 2014.
Supporting information specific to SPD (Scotland) can be found in the Supplier Journey section of the Scottish Government website.
[edit] Related articles on Designing Buildings Wiki
- Competitive procedure with negotiation.
- Cyber resilience.
- Dynamic purchasing system under the Single Procurement Document (Scotland).
- Electronic auctions under the Single Procurement Document (Scotland).
- ESPD and the decline of the PQQ.
- European Single Procurement Document ESPD.
- Exclusion grounds under the Single Procurement Document (Scotland).
- Find a Tender.
- Innovative partnership procedure.
- Negotiated Procedure without Prior Publication NPwPP.
- OJEU procurement procedures.
- Procurement route.
- Reserved contract.
- Restricted procedure under the Single Procurement Document (Scotland).
- Social Enterprise Network Scotland SENScot.
[edit] External resources
- Scottish Government, Supplier Journey.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.