Highway drainage
Contents |
[edit] Introduction
The construction of roads affects the natural surface and subsurface drainage pattern of watersheds or hill-slopes. The provision of adequate drainage is important to prevent the accumulation of excess water or moisture on or within road constructions that can adversely affect their material properties, compromise overall stability and affect driver safety. Drainage must cope with water from the carriageways, hard shoulders, foot/cycle paths, verges, and adjacent catchment areas.
The design of highway drainage will depend on several factors, including:
- The intensity of rainfall expected.
- The size of catchment area.
- The permeability of the surfaces.
The road camber or cross-fall should be designed to cope with heavy water run-off. Insufficient cross-fall can increase the risk of vehicles skidding or aquaplaning on the surface water. The standard cross-fall for roads is usually taken as 1:40, although the camber will vary depending on the individual requirements of the road.
[edit] Urban roads
Surface water is generally collected in channels at the road-side and discharged through gullies (drainage gratings at the edges of the road) into storm water sewers. Gullies are typically positioned at intervals of 25-30 m, depending on the road width and nature of the cross-fall. Gully covers can be either top opening or side opening.
To reduce the number of required drainage points, pavings and verges should be graded towards the channel.
Culverts may also be used. A culvert is a closed conduit or tunnel used to convey water from one area to another, normally from one side of a road to the other side.
For more information, see Culvert.
[edit] Rural roads
Minor roads usually use simple openings or channels which feed into roadside ditches.
Most main roads use a system of gullies and piped sewers. However, soakaways may also be used to discharge water, these are large underground chambers into which water flows from a gully. Water collects and gradually soaks through holes into the surrounding ground or to streams and roadside ditches.
For more information, see Soakaway.
For roads with hard shoulders, it is usual for the kerb to be kept flush with the road surface, with a precast concrete channel placed at the outside edge to drain water. This channel discharges water into gullies.
[edit] Related articles on Designing Buildings Wiki:
- Bituminous mixing and laying plant.
- Catchment flood management plans.
- Code of Practice for Ironwork Systems Installation and Refurbishment.
- Drainage.
- Gulley.
- Highway engineers and drainage.
- Infrastructure.
- Kerbs.
- Manhole.
- Manhole cover.
- Overview of the road development process.
- Pavement.
- Planning for floods.
- Pumps and dewatering equipment.
- Road construction.
- Road improvement scheme consultation.
- Road joints.
- Runway construction.
- Section 50 agreement.
- Sewer construction.
- Soakaway.
- Successful road kerb trial.
- Sustainable urban drainage systems SUDS.
- Types of road and street.
- Water engineering.
[edit] External references
- ‘Introduction to civil engineering construction’ (3rd ed.), HOLMES, R., The College of Estate Management (1995)
- ‘Building Construction Handbook’ (6th ed.), CHUDLEY, R., GREENO, R., Butterworth-Heinemann (2007)
Featured articles and news
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.