Sight line
Contents |
[edit] Introduction
A sight line is an unobstructed line of sight (or view) extending from a viewer to some object or landscape in the distance. The sight line makes it possible for the viewer to see some object in the distance. If a sight line to an object is impeded, the viewer will not be able to see the object in question.
A person in a cinema may block the sight line of the screen of the person sitting immediately behind them. Or, a tall building may obstruct the site line of a view of a historic monument.
Sight lines are important concepts in various fields, such as urban planning, particularly junction layouts, theatres and stadia. If a theatre seat has good sight lines, the occupier of that seat will likely have a good view of all the stage; if there is a column in front or to the side, the viewer may have restricted sight lines.
In stadia, seats are raked, with each row a step above the one in front, in order to ensure best possible sight lines for all spectators.
Sight lines can be divided into two components: vertical and horizontal. If an audience member has good vertical sight lines, they may be able to see the top and bottom of the screen or proscenium. Good horizontal sight lines give a full view of the left-right horizontal extent of the screen or stage. It may be possible in a theatre or cinema to have good horizontal sight lines but not good vertical sight lines ie, the full width of the screen is visible but some of the lower section is obstructed due to the balcony of the upper circle.
[edit] C-value
An important consideration in cinemas, theatres and stadia is the ‘C value’. This is the vertical distance between the eye of the spectator to where it intersects the sightline of the spectator immediately behind (and above).
[edit] View corridor
This is a three-dimensional corridor of sight between an observer and a location, monument or other object in the distance. For example, a tall building in London may be refused planning permission – or its height may have to be restricted – because it compromises the viewing corridor to St Paul’s Cathedral of a person 10 miles away in Richmond Park.
View corridors are designed to protect the view of important monuments, buildings or landscapes. They are also a mechanism for ensuring that the character of villages, towns and cities is not compromised by the rapid rate of development that sometimes occurs in urban areas.
[edit] Protected views
Once a corridor is established, it becomes known as a ‘protected view’ or ‘protected vista’. London has 13 of them protected by the London View Management Framework. One of the protected views is that from Alexandra Palace in North London to St Paul’s Cathedral in the City.
See also: Line of sight.
[edit] Related articles on Designing Buildings
- Architecture of concert stage designs.
- Avoiding planning permission pitfalls.
- Conservation areas.
- Detailed planning application.
- Environmental impact assessment.
- Line of sight.
- Listed buildings.
- National Planning Practice Guidance.
- Neighbourhood planning.
- Permission.
- Permitted development.
- Planning conditions.
- Pre-application advice.
- Wembley Arena.
Featured articles and news
Classroom electrician courses a 'waste of money'
Say experts from the Electrical Contractors’ Association.
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.