Pitt Review Lessons learned from the 2007 floods
Contents |
[edit] Introduction
The Pitt Review: Lessons learned from the 2007 floods, published on 25 June 2008, was prepared by Sir Michael Pitt following the widespread flooding that took place in England in June and July 2007. The 505 page report was commissioned by the Secretary of State for Environment, Food and Rural Affairs, the Secretary of State for Communities and Local Government and the Chancellor of the Duchy of Lancaster.
55,000 properties were flooded, 7,000 people had to be rescued and 13 people died in June and July 2007. Nearly 500,000 people were left without water or electricity and the insurance bill was expected to be more than £3 billion. Tim Brain, Chief Constable of Gloucestershire said “In terms of scale, complexity and duration, this is simply the largest peacetime emergency we’ve seen”. 2007 was a year of more than 200 major floods globally, causing £40 billion worth of damage. However, the floods in England were the most expensive.
Sir Michael Pitt was asked to carry out a review focussing on; flood risk management, the resilience and vulnerability of critical infrastructure, the emergency response, emergency planning and the recovery phase. This was described by Pitt as "...one of the widest ranging policy reviews ever carried out in the UK".
[edit] Recommendations
The review began in August 2007. More than 1,000 pieces of written evidence were received during a three month consultation period. An interim report was published in December 2007 and a progress report on urgent recommendations was published on 16 April 2008.
Pitt suggested that “… the risk of flooding continues to escalate; making the events that shattered so many communities last year an ever increasing threat” (Ref gov.uk press release 25 June 2008).
Key recommendations of his final report included:
- Establishing a cabinet committee to address the risk of flooding.
- Adopting a long-term approach to flood risk management, with priority given to adaptation and mitigation, and above inflation increases in the resourcing of flood resilience measures.
- Establishing a National Resilience Forum to facilitate emergency planning at a national level.
- A presumption against building in high flood risk areas.
- Pre-planning financial arrangements for responding to exceptional emergencies.
- Action to ensure the resilience of critical infrastructure such as power, water and transport (in particular dams and reservoirs).
- A wider brief for the Environment Agency, taking a national overview of all flood risk.
- A ‘step change in the quality of flood warnings ‘ with the Environment Agency and the Met Office working to improve forecasting, modelling and warning systems.
- Establishing a national capability for flood rescue.
- Using armed forces personnel to provide logistical advice during civil emergencies.
- Providing better information, awareness and advice.
- Preventing householders from laying impermeable surfaces on front gardens.
- Removing the automatic right to connect surface water drainage from new developments to the sewerage system.
- Local authorities leading on the management of local flood risk.
- Preparation of emergency flood kits by the public.
- A Director in Defra overseeing the programme of delivery and issuing regular progress updates.
- The Environment, Food and Rural Affairs Select Committee assessing progress after 12 months.
[edit] After the review
A number of responses, progress reports and legislative changes have been made since the Pitt Review:
- The government response to the Pitt Review was published in December 2008 accepting all of the Report’s recommendations and undertaking to implement them.
- In 2008, the government published Future Water, The Government’s water strategy for England.
- Progress reports were published in June 2009 and December 2009.
- The Flood and Water Management Act was introduced in April 2010.
- The National Flood Emergency Framework was published in July 2010.
- The National Flood and Coastal Erosion Risk Management Strategy for England was published in July 2011.
- The first UK Climate Change Risk Assessment was published in January 2012.
- A final progress report was published on 27 January 2012
The final progress report suggested that 43 of the 92 recommendations in the Pitt Review had been implemented and a further 46 were progressing (although no deadlines were given for these remaining recommendations). Dr Pete Fox, Head of Strategy and investment, Flood and Coastal Risk Management, at the Environment Agency suggested that "Some really good things have come out of the Pitt Review, but plenty more needs to happen” (ref BBC news Floods 2007: Five years on, has enough been done?)
[edit] Related articles on Designing Buildings
- Catchment flood management plans.
- Flood.
- Flood and Water Management Act.
- Flood insurance.
- Flood risk.
- Flood risk management plans.
- Future flood prevention.
- Future Water, The Government’s water strategy for England.
- Lead local flood authorities LLFAs.
- Planning for floods.
- River engineering.
- SuDS - is there light at the end of the tunnel?
- Sustainable urban drainage systems (SUDS).
- Water engineering.
[edit] External references.
- The report in full.
- Press Release: Sir Michael Pitt Publishes Final Report: Learning Lessons from the 2007 Floods (25 June 2008)
- Progress on urgent recommendations (16 April 2008)
- Centre for Ecology & Hydrology: “The summer 2007 floods in England and Wales – a hydrological appraisal”.
- The June 2007 floods in Hull – IRB Report.
- The Foresight Report into Flood and Coastal Defence.
- Gloucestershire 2007 – the Impact of the July Floods on the Water Infrastructure and Customer Service – Severn Trent.
- Flooding Review Emerging issues - Chief Fire and Rescue Adviser (CLG).
- The Government’s Response to Sir Michael Pitt’s Review of the summer 2007 Floods, Final Progress Report. 27 January 2012.
- Updating Foresight: Future Flooding, The Foresight: Future Flooding Study (2004).
- BBC news Floods 2007: Five years on, has enough been done?.
- National Flood Emergency Framework.
- The Flood and Water Management Act.
- National Flood and Coastal Erosion Risk Management Strategy.
- Flood & Water Management Act 2010: Progress Report on Implementation (2012).
- Pitt review: Interim report. December 2007.
Featured articles and news
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.