New Homes Accelerator programme
Contents |
[edit] Background
The New Homes Accelerator was first announced by the Chancellor on 8 July 2024 and is a key component of the government’s commitment to deliver 1.5 million new homes by the end of this parliament.
[edit] About the New Homes Accelerator
The New Homes Accelerator is a collaboration between the government, Homes England, the Greater London Authority, local authorities, developers and other key stakeholders. It aims to unblock and accelerate the delivery of housing developments that have for various reasons become delayed, or which are not progressing as quickly as they could be.
[edit] How the New Homes Accelerator works
The New Homes Accelerator will focus on selected large-scale housing developments that are encountering significant delays or obstacles.
By leveraging government resources including Homes England, working closely with local authorities, and fostering collaboration with developers and landowners, the New Homes Accelerator will:
- identify and address specific thematic issues causing delays, such as coordination failures, regulatory obstacles, and local authority capacity constraints
- deploy expert teams to provide on-the-ground support to local authorities, offering planning and enabling assistance to expedite the development process
- utilise its resources to unblock and accelerate delivery on sites that are facing delays or not progressing as quickly as they could be
- inform future reforms to housing and planning policy, where policy barriers to rapid housing delivery are identified
[edit] Call for evidence
The Ministry of Housing, Communities and Local Government (MHCLG) launched a call for evidence on 29 August 2024.
Developers, local authorities and landowners were invited to identify large-scale housing developments that are delayed or stuck so the government can better understand the scale of the challenge and evaluate what support it can provide to help overcome barriers to development and accelerate delivery.
The New Homes Accelerator will set out next steps shortly to those who have submitted information in response to this call for evidence, which closed on 31 October 2024.
Submitting a site does not guarantee any follow up or government support.
[edit] Next steps
The application process has now closed and the government is in the process of reviewing all submissions. Due to the high volume of responses, the New Homes Accelerator team may not be able to respond to all submissions.
This article is based on the informaton provide by the government at "New Homes Accelerator programme" updated 1 November 2024.
[edit] Related articles on Designing Buildings
- Brownfield Passport.
- Consultation on proposed reforms to NPPF and other changes to the planning system.
- Design Council Homes Taskforce launched to support 1.5 million homes target within UK climate commitments.
- Detailed planning permission.
- Golden rules for the release of land.
- Grey belt.
- How long does it take to get planning permission.
- How long does planning permission last.
- IHBC response to revised NPPF.
- Killian Pretty Review.
- Local plan.
- Localism Act.
- National Planning Framework.
- National Planning Practice Guidance.
- Neighbourhood development order.
- Neighbourhood planning.
- New Towns Taskforce.
- NPPF consultation briefing notes on terms.
- NPPF inquiry.
- Outline planning permission.
- Planning legislation.
- Planning permission.
- Planning policy replaced by the NPPF.
- The grey, the brown and the golden rules of housing.
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.