The New Rules of Measurement (NRM) are published by the Royal Institution of Chartered Surveyors (RICS) and prepared by the Quantity Surveying and Construction Professional Group. They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects. Adopting a standard methodology such as NRM facilitates consistency and benchmarking and helps avoid disputes.
NRM is a suite of documents, comprising three volumes:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM2: Detailed measurement for building works (replacing the Standard Method of Measurement, seventh edition SMM7).
- NRM 3: Order of cost estimating and cost planning for building maintenance works.
NRM1 was first published in February 2009 as the RICS new rules of measurement: Order of cost estimating and elemental cost planning. A second edition was published in 2012, renamed RICS new rules of measurement: Order of cost estimating and cost planning for capital building works. It was renamed to better distinguish between capital building works and building maintenance works. Amongst other changes, the arrangement of elements was also revised. The second edition became operative on 1 January 2013.
NRM2 was published in April 2012. It became operative on 1 January 2013 and formally replaced the Standard Method of Measurement, seventh edition (SMM7) on 1 July 2013.
NRM3 was published in March 2014.
NRM 1 is a best practice guidance note offering guidance on the preparation of:
- Order of cost estimates.
- Elemental cost models.
- Cost plans.
- Cost analyses.
- Benchmark analyses.
It also provides guidance on:
- Capturing historical cost data for order of cost estimates and elemental cost plans.
- How to describe and quantify items not included in measurable building work items, such as; preliminaries, overheads and profit, consultant fees, risk allowances, inflation, and so on.
NRM1 comprises four parts:
- Part 1 sets out the context and definitions.
- Part 2 explains how to prepare an order of cost estimate.
- Part 3 explains how to prepare an elemental cost plan.
- Part 4 provides tabulated rules of measurement for the preparation of cost plans.
NB The New Rules of Measurement are accompanied by the 'Black Book', the QS and construction standards. Together they provide a suite of tools to help the construction industry work more collaboratively and consistently.
[edit] Related articles on Designing Buildings
- Benchmarking.
- Black book.
- Comparison of SMM7 with NRM2.
- Cost plans.
- Elemental cost plan.
- Measurement.
- NRM.
- NRM2.
- NRM3.
- Standard Method of Measurement (SMM7).
[edit] External references
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Comments
Where can I borrow, view, buy this from? No link?
http://www.rics.org/uk/shop/NRM-1-Order-of-Cost-Estimating-and-Cost-Planning-for-Capital-Building-19143.aspx