Quantity
Contents |
[edit] Introduction
Quantity in a general sense is the amount of something that there is, was or will be. This amount may be measured in terms of number, weight, length, area, volume and time. For example, there were 50 accidents last year, or 2kg of flour will be required to make the cake. The same general sense may be applied to construction: the estate when completed will comprise 250 dwellings housing a maximum of 1,000 people.
[edit] Bill of quantities
In a more specialised construction sense, ‘quantity’ or ‘quantities’ can refer to the ‘measured’ (i.e calculated or estimated) amounts that are contained in a bill of quantities.
A bill of quantities is a document prepared by the cost consultant (often a quantity surveyor) that provides project-specific, measured quantities of the items of work required to complete the project. These quantities are usually highlighted in the drawings and specifications that form part of the tender documentation.
Preparing a bill of quantities requires that the design is complete and a specification has been prepared. The bill of quantities is issued to tenderers to enable them to prepare a price for carrying out the works. The bill of quantities assists tenderers in the calculation of construction costs for their tender, and, as it means all tendering contractors will be pricing the same quantities (rather than taking off quantities from the drawings and specifications themselves), it also provides a fair and accurate system for tendering.
However, it is usually the case that during the construction period, the quantity surveyor prepares different forms of quantities by measuring and valuing the work carried out at regular intervals. These new quantities allow the client to accurately and fairly pay the contractor for the work completed.
For more information see: Bill of quantities.
[edit] Standard methods of measurement
In order to ensure cross-industry harmonisation, it is important that the way building quantities are measured is conducted on a consistent basis and allows the costs of different projects to be compared meaningfully. To achieve this, quantity surveyors can use standard ways to measure quantities. This includes the Standard Method of Measurement (SMM7) or New Rules of Measurement (NRM 2) and Agreed Rules of Measurement 4.
For more information see: SMM7 and NRM.
[edit] Approximate quantities.
A development of the elemental cost plan of estimating construction project costs, approximate quantities form part of an approximate quantities cost plan which represents a first attempt to measure defined quantities from drawings (or to ‘take them off’)
An approximate quantities cost plan is part of the iterative cost planning process and is a development of the elemental cost plan. Unlike the elemental cost plan (in which the cost of elements is broken down from the overall construction cost, based on the experience of the cost consultant and known costs of similar completed projects), the approximate quantities cost plan is a first attempt to measure defined quantities from drawings. In effect, it is a costed approximate bill of quantities.
For more information see: Approximate quantities.
[edit] Related articles on Designing Buildings
Featured articles and news
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.