While the impact of Covid-19 is still being felt across the globe more than two years on, a new report published by the Chartered Institute of Building (CIOB) suggests the pandemic has left some positive legacies for the UK construction industry.
The report, ‘Learning lessons from the Covid-19 pandemic to strengthen the construction industry’, looks at how adaptations in the sector throughout the pandemic have helped improve long standing issues including collaboration and communication between contractors and clients, and flexible working patterns along with payment processes and worker wellbeing.
It cites the construction of Nightingale hospitals as an example of how better flexible working, collaboration and communication on a scale not typically associated with the construction sector, led to projects being completed in just nine days. The CIOB says lessons learnt from such projects must continue to strengthen the construction industry, not only for those working within it, but also for those they build for.
Comment
Daisie Rees-Evans, Policy and public affairs officer at CIOB, said: “Covid-19 had a monumental impact on people’s lives and livelihoods with businesses needing to adapt how they operate to keep their workers safe while staying financially afloat. Since the outbreak of the virus in the UK, we have seen a shift in business practices with construction seeing large improvements in supply-chain collaboration, access to hygiene facilities and provision for worker wellbeing.
“Our report reflects on the progress that’s already been made and what further opportunities can be harnessed to deliver change that positively impacts construction businesses, workers and the communities they build for. With the UK Government committing to procuring for social value, the publication of our report is timely in its approach to seek true cultural change.”
Paul Singh, Commercial director at project and programme management consultancy, EEDN, said: “The pandemic has definitely increased collaboration and empathy within the industry from clients to consultants and contractors, opening up dialogue and reducing the adversarial approach.
“Construction has really taken note of the need to prioritise mental health and wellbeing. Projects are now defined with a new, hybrid way of working in mind and spaces have wellbeing built right into them.
“We have also seen greater proactivity when it comes to invoicing and payments, with invoices often being settled before the payment period is up. There is undoubtedly still a lot of work to be done but the signs are certainly encouraging.”
Survey
In a recent CIOB survey of 1,400 construction SMEs*, more than half said they have experienced improvements to payment times, hygiene facilities and mental health support since the pandemic struck, with temporary measures introduced as a necessity to keep the sector operating safely during lockdown, having become business as usual.
In total 52% of survey respondents said they’ve seen an improvement in the time it takes to get paid by clients since the pandemic, with more than half also saying they now receive payments in 40 days or less. A survey by the Federation of Master Builders (FMB) in 2017 showed at that time, fewer than a third of construction SMEs were paid within 30 days and almost a quarter were waiting more than four months to receive payments from clients or large contractors.
While this positive step forward has been welcomed, the CIOB research does however highlight that further improving payment terms to under 30 days remains a priority for the majority of SMEs, backing up a call from CIOB in the report for the Government to revisit it’s Prompt Payment Code. The code was overhauled mid-pandemic in 2021 to ensure those signed up paid small businesses within 30 days, however signing up remains voluntary, and in January this year the code had a mere 3,500 signatories.
This article originally appeared on the CIOB news and blog site under the same title, posted by the Press Office and on August 26, 2022.
--CIOB
Related articles on Designing Buildings
- Coronavirus.
- COVID-19 and mental health within construction firms.
- Covid-19 and the new normal for infrastructure systems - next steps.
- Covid-19 and the new normal for infrastructure systems.
- COVID-19 and the US HVAC sector.
- Designing HVAC to resist harmful pathogenic microorganisms (bacteria and viruses such as influenza and 2019-nCov).
- Furlough.
- Pandemic.
- Pandemic migration.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.