Indemnity clauses in design and construction contracts
An indemnity clause in a contract allocates risk for claims or for loss or damage between the parties to the contract, so that if one party suffers a loss, the other party will reimburse them. Indemnities are primary obligations that remain even if the contract is set aside.
Indemnity clauses are commonly used on construction projects to allocate risk between; the client and contractor, the client and consultants or the contractor and sub-contractors. In complex contracting situations indemnity clauses may run throughout the contractual chain.
Construction contracts may, for example, include a clause requiring the contractor to indemnify the client against expense, liability, loss or claim in respect of personal injury or death of any person arising out of the works. Or they may require the contractor to indemnify the client against breaches of contract such as non-payment of statutory fees. In addition, designers appointment agreements may include an indemnity in respect of claims for breach of professional duty.
Typically, designers are required to hold professional indemnity insurance to cover such a liability and this requirement is now increasingly asked of contractors with design responsibilities. (See Legal indemnities for a list of other situations where insurance can indemnify against losses).
Performance bonds and parent company guarantees may also include indemnity clauses requiring the surety to indemnify the client against default by the contractor.
The precise consequences of an indemnity clause will depend on its wording and how it is read in relation to the rest of the contract. One particular area where differences can be significant is whether a clause requires an indemnity only against losses caused by the party providing the indemnity, whether they exclude negligence on the part of the indemnitee, or whether they cover all losses no matter how they were caused. For example, a professional indemnity insurance policy is not dependent on allocating blame to the indemnifier.
Because of these differences, and in order to accurately define the extent of losses covered, indemnity clauses require very precise drafting, and due to complex case law they are becoming increasingly detailed. It is important therefore that the parties to a contract read indemnity clauses carefully and fully understand the obligation they are agreeing to.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February