Human-machine interface
Guide to Controls (BG 83/2023) written by John Marrow and published by BSRIA in June 2023, defines a human-machine interface (HMI) as: ‘The device which enables the user to interact with a building management system. It is usually a PC but may be another device such as a smartphone or tablet.’
It states: 'In a BMS, the HMI is where an operator can manage the day-to-day running of plant and equipment. This can be hosted by a laptop or PC. If the HMI is in a fixed location, then it is often referred to as the front end or head end. The HMI can be physically located anywhere; however, it is usually in a location local to the building plant or equipment. Touch screens can be provided for users. If the HMI is disconnected from the system network then all automation and field controllers will continue to operate.'
--BSRIA
[edit] Related articles on Designing Buildings
Featured articles and news
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
A dynamic brand built for impact stitched into BSRIA’s building fabric.