Heating plant emission rate
According to the Domestic Building Services Compliance Guide published by HM Government in 2013, the term ‘Heating plant emission rate (HPER)’ refers to:
… the annual carbon dioxide emissions from fuel and power consumed by the heating plant, offset by the emissions saved as a result of any electricity generated by the heating plant, divided by the heat output over the year. It is measured in units of kg of carbon dioxide per kWh. To calculate HPER it is necessary to know the plant size ratio.
The plant size ratio (PSR) is the nominal heat output of the heating plant divided by the design heat loss (the average heat loss of the building on a cold day with a temperature differential of 24.2°C).
Note: The heating plant emission rate includes any auxiliary space and water heating that may be necessary, i.e. it represents the performance of all heating plant needed to provide space and water hating service to the building, assuming a standard demand pattern.
Note: For a given heat demand, the plant size ratio determines the part-load condition for the heating plant.
[edit] Related articles on Designing Buildings Wiki
- Building services compliance with the building regulations.
- Building services.
- Corrosion in heating and cooling systems.
- Domestic building services compliance guide.
- Gross calorific value.
- Heat pump.
- Heat recovery.
- Heating.
- Non-domestic building services compliance guide.
- Overheating.
- Radiant heating.
- Space heating system.
- Underfloor heating.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.