Exceptional circumstances
Exceptional circumstances refer to events outside of the control of a particular party, also referred to a extenuating circumstances and extraordinary circumstances or sometimes unexpected exceptional circumstances. Although in general the latter two are used to describe events that negatively impact a contract or project, exceptional circumstances is most often used in the same context but could also be used to describe positive impacts on a construction project. For example exceptional circumstances meant the contractors were able to complete the project earlier than planned, exceptional weather allowed us to continue working into the winter months. These examples are however relatively rare and as such the description below mainly covers negative impacts of construction projects or the ability of staff to carry out their duties.
The term may be used in relation to force majeure, although also related to events beyond the reasonable control of a party, which prevent or impede their ability to perform their obligations under a contract, force majeure maybe be a more significant and contractual occurrence. Generally these cannot be event that a party could reasonably have avoided or overcome, or one attributable to the other party. The term may also be used in relation frustration in construction contracts, though again this generally has greater significance and impact because it leads to the contract being terminated without either party being considered to be in breach.
The term exceptional or extenuating circumstances tends to be used as a reasoning for a particular outcome, so rendering the conduct less serious or potentially lead to reduced damages. It is most commonly used in relation to employment but it important o note that extenuating circumstances under employment law are likely to differ from those that may be considered under a building contract.
In most cases it is a complex interpretable subject in any context. For example serious medical issues with staff maybe presented as extenuating circumstances to be considered, however within a building contract, it could be responded to that the impacts on the project may have been avoided, if other staff had been made available. Unless many staff became unavailable, due to for example a pandemic.
It is common in some cases for examples of extenuating circumstances to be given within the contract itself to avoid confusion. Here are some examples of what might be considered as extenuating circumstances, though they would have to be agreed ideally before and if not after the event.
- Medical issues (including mental health/wellbeing)
- Death of relatives
- Personal problems
- Personal or Family issues, such as divorce
- Period of self-isolation/quarantine
- Caring responsibilities and domestic difficulties
- Religious Observances
- Pregnancy related conditions
[edit] Related articles on Designing Buildings
- Breach of contract.
- Clear contracts during uncertain times.
- Compensation event.
- Concurrent delay.
- Consequential loss.
- Coronavirus and force majeure.
- Exigency.
- Extension of time.
- Force majeure.
- Frustration.
- frustration in construction contracts.
- Loss and expense.
- Liquidated damages.
- Neutral event.
- Relevant event.
- Suspension of performance.
- Termination in construction contracts.
- Variations.
Featured articles and news
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
AI and automation in 3D modelling and spatial design
Can almost half of design development tasks be automated?
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
The maintenance challenge of tenements.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.
Shortlist for the 2025 Roofscape Design Awards
Talent and innovation showcase announcement from the trussed rafter industry.
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese as well as English.