Design Best Practice Self-Assessment Tool
Access the latest version of the Design Best Practice Self-Assessment Tool here.
Contents |
[edit] Background
Typically today:
- Construction projects have many quality metrics for the delivery phase but Clients have very few metrics for the Concept and Developed design stages of their projects.
- Evidence from projects, supported by analysis by the GIRI (Get It Right Initiative) in the UK, shows that the average construction project overruns its budget by 20% with worst case examples being 3-400% with time overruns of many years. The analysis concluded that many project quality issues have their root cause in the design stages of a project. Both the Client and the Architect processes often have a significant bearing on these issues.
In 2020, the Chartered Quality Institute published a piece of Quality guidance called the Construction Project Lifecycle which laid out the key Quality steps required to maximise the chance of success in construction projects. This guidance sparked wide interest and positive comments around the world. These interested people felt that more guidance about Quality Best Practices in the design stages of projects would be an extremely useful guidance tool.
[edit] The Best Practice Tool
This Quality Best Practice Self-Assessment tool (for Concept and Developed Design Stages) has been developed by a small group of leading quality experts from America, Australia, Canada & the UK, from a tool developed in the UK Airport Infrastructure industry.
The tool is aimed primarily at Construction Clients but can be used by Architects or Construction companies involved in the Concept and design stages of a project.
The belief is that use of this tool can significantly reduce the risks faced in projects by following well proven best practices developed from around the world. This will lead to major cost avoidance, timely delivery, and enhanced reputations.
[edit] When should this Tool be used?
The tool should be used during the Concept Design and Developed Design stages of a project (as defined by UK's RIBA organisation). Sometimes called Options and Scheme design stages.
The starting point is the Business Case approval Gateway (or some kind of project kick off decision.) That is: - a Client/Owner has had an idea, decided that it should be explored and set aside the necessary funds to develop a more detailed proposal.
At the end of the Concept stage, there may be a Recommended Option Approval Gateway before the commencement of the Developed Design Stage. On lower risk projects, this may also include funding for the entire project.
At the end of the Developed Design Stage, it is likely that the more detailed cost and schedule would be used to seek approval for the funding of the entire project.
After this (and not covered by this guidance) the project would move to production design, delivery stages and then to Handover and Operation/Maintenance.
[edit] How is the tool used?
The Tool is a subjective assessment of project progress made by the Project Manager, Quality Manager and a PMO representative.
It takes about 1-2 hours to complete and should be undertaken three times during each stage of the project.
The tool outputs a ‘percentage complete’ score. Experience has shown that projects with acceptable levels of risk have scores well over 90%. Any score lower than this should prompt many questions and careful risk assessment.
Access the tool here:
[edit] Contributors
Original work commissioned by Heathrow and lead by Helen Soulou with much input from Arup, Atkins and Jacobs.
The subsequent development of the tool has been undertaken by:
- Anita McReynolds Lidbury Arcadis (USA)
- David Myers Shirley Parsons Project Services (UK)
- Felipe Maya CIH - Construction Innovation Hub (UK)
- Greg Wennerstrom Calgary Light Rail Project - Canada
- Jonny Montgomery Shirley Parsons Project Services (UK)
- Martin Andrews Martin Andrews Solutions (Australia)
- Zoran Stojanovski AECOM (Australia)
Original article written by David Myers on behalf of the CQI Construction Special Interest Group and approved for publication on 4th May, 2021.
Version 2 of the Design Best Practice Self-Assessment Tool was made available 26/3/2022.
--ConSIG CWG 23:30, 16 May 2021 (BST)
[edit] Related articles on Designing Buildings
- 5 Whys
- Annex SL
- CDM Regulations: a quality perspective
- Change control: a quality perspective
- Checking and approval in design - a quality management perspective
- Collaboration: a quality management perspective
- Cost of quality.
- Design freeze: a quality perspective
- Design: a quality management perspective
- Quality Checklist
- Quality culture and behaviours
- Quality management systems (QMS) - beyond the documentation.
- Quality manuals and quality plans
- Quality tools: fishbone diagram
- Stakeholder management: a quality perspective
Featured articles and news
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
50 million new trees over 25 years.
Art of Building CIOB photographic competition public vote
The last week to vote for a winner until 10 January 2025.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.
20 years of the Chartered Environmentalist
If not now, when?
Journeys in Industrious England
Thomas Baskerville’s expeditions in the 1600s.
Top 25 Building Safety Wiki articles of 2024
Take a look what most people have been reading about.
Life and death at Highgate Cemetery
Balancing burials and tourism.
The 25 most read articles on DB for 2024
Design portion to procurement route and all between.
The act of preservation may sometimes be futile.
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.