Capping clause
A capping clause is a contractual provision that limits the liability of a party to a contract. It sets a maximum limit, or cap, on the amount that one party can be required to pay to the other in the event of a breach of contract, negligence, or other specified circumstances. This is particularly relevant in construction contracts where the financial implications of potential risks and liabilities can be substantial.
For example, a capping clause might state that the contractor's liability for delays is capped at 10% of the contract value. This means that if the project is delayed due to the contractor's fault, the maximum amount the contractor would be liable to pay in damages would be limited to 10% of the total contract price.
Capping clauses help parties manage and allocate financial risks more effectively. By knowing the maximum potential liability, parties can make informed decisions and arrange appropriate insurance coverage. It provides certainty and predictability regarding financial exposure, which is crucial for budgeting and financial planning, and can be a valuable negotiation tool, allowing parties to agree on acceptable levels of risk and reward.
The clause specifies a maximum monetary amount that one party's liability cannot exceed. This limit can be a fixed sum, a percentage of the contract value, or linked to the insurance cover available.
The clause can define which types of liabilities are subject to the cap. This might include direct losses, indirect losses, consequential damages, or specific types of claims such as those arising from defects or delays. Certain types of liabilities are often excluded from the cap. Common exclusions include liabilities for death or personal injury caused by negligence, fraud, and willful misconduct. These exclusions ensure that the cap does not provide protection in cases of serious wrongdoing.
The clause applies to claims arising under the contract, which may include breaches of contract, tort claims (such as negligence), and statutory liabilities.
The cap should be set at a level that reasonably reflects the potential risks and losses that might arise. If set too low, it may not provide sufficient protection for the non-breaching party. Parties often align the cap with the insurance coverage available. It is important to ensure that the cap is consistent with the terms and limits of the relevant insurance policies.
Capping clauses can be mutual, applying to both parties, or unilateral, applying to one party only. The fairness and balance of the clause should be considered during negotiations.
The enforceability of capping clauses can depend on the specific wording and the context in which they are used. Courts may scrutinize these clauses, particularly if they appear to be overly restrictive or unreasonable.
It is essential to carefully draft and negotiate these clauses to ensure they are fair, reasonable, and adequately protect the interests of all parties involved.
[edit] Related articles on Designing Buildings
- Agreement.
- Clause.
- Collateral warranty.
- Construction contract.
- Construction contract conditions.
- Contract administrator.
- Contract negotiations.
- Essentials of a contract.
- Guaranteed maximum price.
- Implied terms.
- Modifying clauses in standard forms of contract.
- Professional indemnity insurance clause in conditions of engagement.
- Standard form of contract.
- The Chancery Lane Project.
- Z clauses.
Featured articles and news
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.