Urban uplift
Urban uplift or urban centres uplift aswell as cities uplift in design and construction terms refers to revisions made to the Standard Method for assessing local housing needs as adjusted in the National Planning Policy Framework (NPPF) in 2021.
The conservative government at the time reverted to the 2018 version of the Standard Method for assessing local housing needs, with the change that the 20 largest Cities and Urban Centres in England recieved a 35% uplift on their targets. The uplift was applied to the Local Planning Authority (LPA) in each city or urban area with the largest population, (except in the case of London), so the uplift in other cities such as Liverpool, Manchester, Newcastle etc did not apply to the whole urban area.
Further information on the uplift and other policies effecting the NPPF, published under the 2022 to 2024 Sunak Conservative government can be found in the Levelling-up and Regeneration Bill: reforms to national planning policy. Updated 19 December 2023
[edit] Related articles on Designing Buildings
- A guide to the updated National Planning Policy Framework.
- BRE response to the NPPF consultation.
- Detailed planning permission.
- How long does it take to get planning permission.
- How long does planning permission last.
- IHBC response to revised NPPF.
- Killian Pretty Review.
- Local plan.
- Localism Act.
- National Planning Framework.
- National Planning Practice Guidance.
- Neighbourhood development order.
- Neighbourhood planning.
- NPPF inquiry.
- Outline planning permission.
- Planning legislation.
- Planning permission.
- Planning policy replaced by the NPPF.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.