Thermal zones in building design
In the design of heating ventilation and air conditioning systems (HVAC), a ‘zone’ is an area of a building in which temperature is controlled by one thermostat. This is not the same as a single space or room. For example, a small house, in which thermal demand is relatively constant throughout, might be controlled by a single thermostat and so considered a single zone.
In a more complex, larger building where there may be significant differences in thermal demand, there may be multiple zones.
In simple buildings, a single zone might be supplied by a single boiler, or air handling unit. In more complex buildings with varying demands, multiple zones might be supplied by a single central HVAC system, but each zone might correspond to a single terminal unit that provides local thermostatic control.
Carefully designed zoning can help rationalise different thermal demands and so reduce the number of HVAC subsystems required. This can reduce capital and operational costs. It is important that this is considered as an integral part of the concept design stage and that HVAC is not simply added on at the end of the design process.
HVAC zones can also refer to areas of humidity control, for example office spaces might require humidity control, whilst garages might not.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.