Scope of work
The Association for Project Management describes ‘scope’ as ‘The totality of outputs, outcomes and benefits and the work required to produce them’ and ‘scope management’ as ‘The process whereby outputs, outcomes and benefits are identified, defined and controlled’.
In construction, the term ‘scope of work’ (sometimes described as a ‘scope of works’, ‘statement of work’ or 'terms of engagement') is a very general, and sometimes ambiguous term referring to a general description of the work that is expected to be performed under a particular contract. It may be prepared by the client or their consultants and included in tender documentation for construction works.
The nature of the scope of work can vary significantly from project to project. Sometimes it will simply offer a very broad description of the works required, whilst sometimes it provides a complete description of the project, significant milestones, a programme of work with the expected time frames for delivery, reports, pricing, deliverables, roles and responsibilities and end products that are to be provided.
For more information, see What should be included in a scope of work?
A scope of work can be a useful way of agreeing broad project requirements for both the client and supplier. However, errors or inconsistencies with other contract documentation can lead to confusion and uncertainties which are often cited as a cause of disputes on construction projects.
It is common for changes to be required to the scope of work after the contract has been awarded. Most forms of contract make provisions for the contract administrator to instruct reasonable variations which may give rise to additions or deductions from the contract sum, however, these variations must not change the nature of the works themselves. In some cases, the works may be tendered before the scope of work is known in detail. In this case, provisional sums may be included in the contract, or flexible procurement routes adopted such as measurement contracts or prime cost contracts.
The term ‘scope of work’ is generally used to refer to construction activities, however, a ‘scope of services’ which describes the services a consultant will be performing on a project may also sometimes be referred to as a scope of work.
Confusingly, the term ‘scope of work’ can also used interchangeably with the term ‘schedule of work’. However, a schedule of work has a more specific meaning, referring to 'without quantities' instructional lists often produced on smaller projects or for alteration work as an alternative to bills of quantities, allowing the pricing of items such as builders work and fixing schedules.
[edit] Related articles on Designing Buildings Wiki.
Featured articles and news
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.