Integrated systems
Integrated systems, or systems integration, is the process of bringing together component sub-systems into one functional system. It provides a system with coherence by making the parts or components work together, or ‘building or creating a whole from parts’ (Langford, 2013).
It has particular relevance to information technology – where different pieces of hardware and software act together as a coordinated system – but also civil engineering and infrastructure projects, where it can be viewed as a distinct phase of the delivery process. The interactions between subsystems enable the integration of sometimes apparently disparate systems, adding value to the system as a whole in terms of increased efficiency, accuracy or cost-effectiveness.
In construction, collaboration is required across many different parties – owners, clients, consultants, contractors, suppliers and so on. Systems integration techniques can be used to synthesise knowledge across different areas of expertise, roles and responsibilities. For example, Heathrow Terminal 5 and the 2012 London Olympics used systems integration to ensure that parts, components, units, sub-assemblies, subsystems and systems worked together as a whole.
The table below contains a summary of the main tools, techniques and approaches for systems integration:
TOOLS, TECHNIQUES & APPROACHES | FOCUS AND USES |
SySML | SysML is a modelling language based on UML that can be used to describe systems and their interconnections. It has been used in research on integrated and sustainable design in buildings and infrastructure. |
General theory of systems integration (GTSI) | Systems consist of objects and processes that have non-reciprocal emergence. An object has mechanisms that have logic structures, enacted in processes involving energy, matter, material wealth and information (EMMI). |
Design Structure Matrix (DSM) | DSM is a matrix used to consider the interdependencies between different components of the process in order to sequence design activities, or of the product in order to understand and cluster ex-ante components with high levels of interdependence. |
Network analysis | Software tools such as UCINet and Gephi are used in social network analysis (SNA), with other programming tools such as igraph. SNA can be used to examine the heterogeneous networks involved in projects and their dynamics. There is an opportunity to link this understanding with performance. |
Systems dynamics | This approach is used in understanding the dynamics of management in complex projects, and for understanding error propagation and rework. |
STAMP | System theoretic accident model which treats accidents as a chain of events rather than seeking root causes, and sees reliability and safety as different properties of systems. |
Montecarlo simulation | Used to get probabilities of different outcomes occurring, with respect to the perturbations of a defined network. Unlike DSM, it can provide information about the resilience of a given network to particular types of events. |
Scenario planning | An operational scenario tool proposed as part of the implementation strategy for asset management. |
Data analytics is increasingly being used by a new generation of systems integration tools to visualise and understand relationships between components, and the systemic consequences of any changes, in complex systems.
Machine learning, graph theory, systems dynamics and scenario planning techniques can all be used to improve the delivery of complex projects. The challenge involves combining data-sets and model-based systems engineering to reveal new patterns.
In addition, new immersive technologies such as virtual reality and augmented reality are being promoted as methods that can enable proactive collective decision-making by understanding projects as complex product systems.
Researchers claim there are opportunities to collect and aggregate data and use new forms of analysis to identify underlying patterns and visualise these to identify risk and build resilience into engineered systems. They point to the military sector which uses command, control, communications and intelligence as a forerunner of the potential of the technique.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- 3D MOVE: Mobile Immersive Visualisation Environment.
- Advanced construction technology.
- Artificial intelligence and civil engineering.
- Augmented reality in construction.
- Collaborative practices for building design and construction.
- Immersive Hybrid Reality IHR.
- Integrated modelling, simulation and visualisation (MSV) for sustainable built healing environments (BHEs).
- Integrated transport system.
- Virtual construction model.
Featured articles and news
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.