Specialist subcontractor
‘Specialist contractor’ is a very broad term that describes a contractor appointed to carry out activities in the development of a built asset that involve specialist construction knowledge and skills. This is as opposed to a ‘general contractor’ who will typically have a range of general construction knowledge and skills.
Typically, general contractors are tier 1, main contractors, working directly for the employer and are in overall charge of construction works. Specialist contractors are generally tier 2 subcontractors working for the main contractor to carry out a specialist part of the construction works. For this reason, they are sometimes referred to as ‘specialist subcontractors’.
However, the construction supply chain is increasingly complex and varied, and so a specialist contractor might be employed directly by an employer (for example to remove asbestos from a building). Similarly, a general contractor might be employed by a main contractor to carry out general construction works on their behalf and so might be referred to as a ‘subcontractor’.
To further complicate the supply chain, specialist subcontractors may have their own suppliers of materials, labour and components, and in some cases, these suppliers may be larger, more general contractors, than the specialist contractor.
The even wider term 'specialist' may be used to refer to specialist contractors, specialist suppliers (such as suppliers of specialist materials or plant) or specialist consultants (such as specialist designers).
The definition of what constitutes ‘specialist’ is not clear, however, examples of areas that might involve a specialist subcontractor could include:
- Cladding and glazing.
- Specialist finishes.
- Building services.
- Information and communications technology.
- Lifts and escalators.
- Fire protection.
- Drilling.
- Piling.
- Flooring.
In addition to providing construction services, increasingly, specialist subcontractors undertake aspects of technical design. Earlier engagement with specialist subcontractors is also possible, and it is common during the ‘developed design’ or ‘detailed design’ stage for the project team to consult with specialist subcontractors to begin to address specific aspects of the design.
Early design input can be secured from specialist subcontractors before the supply contract has been agreed by:
- Informal agreement.
- Writing a closed specification that could only be satisfied by the specialist subcontractor.
- A two-stage tender process where the specialist subcontractor's design services are procured in the first stage along with agreed rates, overheads and profit for the products or services to be supplied in the second stage.
It is important that appointment documents make it clear who has responsibility and liability for different aspects of the design at different stages of the project and the level of detail that they will be expected to produce. Where building information modelling (BIM) is being used, handover of an element of the design to a specialist may require a 'change of ownership' procedure for those parts of the model.
A design co-ordinator may be appointed with specific responsibility for co-ordinating and integrating specialist subcontractors' designs.
The National Specialist Contractors’ Council (NSCC) brings together specialist trade organisations representing businesses engaged in planning, design, construction, refurbishment, and maintenance.
[edit] Related articles on Designing Buildings
- Back-to-back provisions in construction contacts.
- Collaborative practices.
- Contractor.
- Domestic sub-contractor.
- Named specialist work.
- Named sub-contractor.
- Nominated sub-contractor.
- Procurement route.
- SPC 2000.
- Specialist contractors.
- Sub-consultant.
- Trade contractor.
- Works contractor.
[edit] External references
- Gray, C and Flanagan, R (1989) The changing role of specialist and trade contractors. Ascot: Chartered Institute of Building.
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.