Simplified planning zones SPZ
Simplified Planning Zones (SPZ's) were areas in which local planning authorities encouraged development by granting certain specified planning permissions without the need for planning permission or the payment of planning fees.
The policy relating to Simplified Planning Zones was detailed in Planning Policy Guidance 5: Simplified Planning Zones (PPG5). However this was replaced by Planning Policy Statement 4: Planning for Sustainable Economic Growth (PPS4) in 2009, and this in turn was replaced by the National Planning Policy Framework (NPPF - See Annex 3 of the NPPF for a schedule of planning policy guidance and planning policy statements that is replaced by the framework).
The National Planning Policy Framework does not mention Simplified Planning Zones specifically, however it does suggest that planning can be simplified in particular areas:
- Local planning authorities should work together with Local Enterprise Partnerships (LEP's) improving the conditions for economic growth in an area (LEP's are business-led partnerships created to drive sustainable economic growth across local economic areas).
- Local planning authorities can use Local Development Orders to relax planning requirements in particular areas or for particular categories of development to promote economic, social or environmental gains (such as boosting enterprise).
- Neighbourhood Development Orders can be used to grant planning permission for a specific development proposal or classes of development.
- Community Right to Build Orders can be used to allow parish councils and neighbourhood forums to grant planning permission for a specific development proposal or classes of development.
In addition, the government is establishing ‘enterprise zones’ in Local Enterprise Partnerships areas. LEP's are able to bid for enterprise zones. Amongst other things, enterprise zones include simplified planning procedures. This is generally done through the use of Local Development Orders, to allow certain developments without the need for planning permission.
In August 2024 Slough Borough Council launched a consultation for a New Simplified Planning Zone (SPZ) for Slough Trading Estate, which originally had an SPZ applied in 1995, which has been renewed every ten years, in 2004, 2014 and again in 2024. In November the Borough Council voted to adopt the new ten-year Simplified Planning Zone, covering a 168-hectare site. The zone lasts for 10 years and automatically grants full planning permission for specified types of construction of industrial buildings provided a range of conditions are met. Saving applicants from having to apply for planning permission and providing certainty as to the future direction of the Trading Estate.
The council hopes to increase the number of data centres, warehouses and research and development centres in the area through the SPZ, matching the governments intentions to boost data centres throughout the country. The SPZ is supplemented by design codes and funding through a section 106 agreement. The £20 million reserved by the S106 will focus on improving the local area, access and biodiversity.
[edit] Related articles on Designing Buildings
- Community Right to Build Orders.
- Consultation on proposed reforms to NPPF and other changes to the planning system.
- Development corporation.
- Enterprise zones.
- Local Enterprise Partnership.
- National Planning Policy Framework.
- Neighbourhood planning.
- NPPF consultation briefing notes on terms.
- Permitted development.
- Pink zones.
- The grey, the brown and the golden rules of housing.
[edit] External references
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.