Grant
In general terms, the word ‘grant’ refers to allowing permission for someone to do something.
It can also refer to money given to a person or organisation by a body such as the government for a specific purpose.
Functional Standards Common Glossary, published by the Cabinet Office, states: ‘Grant schemes are created to deliver a specific policy area, generally providing for a number of individual awards that sit within the scheme.’
‘A grant award is made to meet one of the objectives of the grant scheme. Grant awards can be made to organisations, registered and unregistered entities and individuals.’
And a grant agreement is: ‘an agreement that provides a legal framework and sets out details of the grant including what the funding is to be used for, what expenditure is expressly eligible and ineligible, together with details of the payment model, performance and monitoring regime, termination and clawback provision, and financial reconciliation.’
The glossary of statistical terms, published by the Organisation for Economic Co-operation and Development (OECD), defines grants as: ‘…transfers made in cash, goods or services for which no repayment is required.’
[edit] Related articles on Designing Buildings
- Bridging loan.
- Collateral.
- Construction loan.
- Defective Concrete Blocks Grant Scheme.
- Derogation from grant.
- Funding.
- General grant.
- Green Homes Grant.
- Grant-in-aid.
- Mezzanine finance.
- Mortgage.
- PF2.
- Private Finance Initiative.
- Project-based funding.
- Property development finance.
- Uncompeted grant.
- Water Environment Grant.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.