Simplified planning zones SPZ
Simplified Planning Zones (SPZ's) were areas in which local planning authorities encouraged development by granting certain specified planning permissions without the need for planning permission or the payment of planning fees.
The policy relating to Simplified Planning Zones was detailed in Planning Policy Guidance 5: Simplified Planning Zones (PPG5). However this was replaced by Planning Policy Statement 4: Planning for Sustainable Economic Growth (PPS4) in 2009, and this in turn was replaced by the National Planning Policy Framework (NPPF - See Annex 3 of the NPPF for a schedule of planning policy guidance and planning policy statements that is replaced by the framework).
The National Planning Policy Framework does not mention Simplified Planning Zones specifically, however it does suggest that planning can be simplified in particular areas:
- Local planning authorities should work together with Local Enterprise Partnerships (LEP's) improving the conditions for economic growth in an area (LEP's are business-led partnerships created to drive sustainable economic growth across local economic areas).
- Local planning authorities can use Local Development Orders to relax planning requirements in particular areas or for particular categories of development to promote economic, social or environmental gains (such as boosting enterprise).
- Neighbourhood Development Orders can be used to grant planning permission for a specific development proposal or classes of development.
- Community Right to Build Orders can be used to allow parish councils and neighbourhood forums to grant planning permission for a specific development proposal or classes of development.
In addition, the government is establishing ‘enterprise zones’ in Local Enterprise Partnerships areas. LEP's are able to bid for enterprise zones. Amongst other things, enterprise zones include simplified planning procedures. This is generally done through the use of Local Development Orders, to allow certain developments without the need for planning permission.
In August 2024 Slough Borough Council launched a consultation for a New Simplified Planning Zone (SPZ) for Slough Trading Estate, which originally had an SPZ applied in 1995, which has been renewed every ten years, in 2004, 2014 and again in 2024. In November the Borough Council voted to adopt the new ten-year Simplified Planning Zone, covering a 168-hectare site. The zone lasts for 10 years and automatically grants full planning permission for specified types of construction of industrial buildings provided a range of conditions are met. Saving applicants from having to apply for planning permission and providing certainty as to the future direction of the Trading Estate.
The council hopes to increase the number of data centres, warehouses and research and development centres in the area through the SPZ, matching the governments intentions to boost data centres throughout the country. The SPZ is supplemented by design codes and funding through a section 106 agreement. The £20 million reserved by the S106 will focus on improving the local area, access and biodiversity.
[edit] Related articles on Designing Buildings
- Community Right to Build Orders.
- Consultation on proposed reforms to NPPF and other changes to the planning system.
- Development corporation.
- Enterprise zones.
- Local Enterprise Partnership.
- National Planning Policy Framework.
- Neighbourhood planning.
- NPPF consultation briefing notes on terms.
- Permitted development.
- Pink zones.
- The grey, the brown and the golden rules of housing.
[edit] External references
Featured articles and news
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.