Settlement of buildings
Contents |
[edit] Introduction
Settlement is the downward movement of the ground caused by a load consolidating the soil below it or causing displacement of the soil. Settlement often refers to the downward movement of the ground around an excavated space, such as that for tunnels, shafts, or basements.
It is usual for buildings to experience some degree of settlement within the first few years after construction. Although the extent to which this ground movement impacts upon buildings depends on several factors, which may include:
- Existing soil conditions.
- Methods of construction.
- Size and depth of the construction works.
- Type of structure, its condition, and its foundations.
The impact of settlement is opposite to the effect of heave which is the upward movement of the ground, and is different from subsidence which occurs where soil is unstable and sinks downward without any imposed load.
[edit] Causes of settlement
Typically, settlement occurs within the foundation soils that surround and support the structure.
The more common causes of settlement include:
[edit] Weak bearing soils
Where soils are not capable of supporting the weight or bearing pressure exerted by a building’s foundation. This can occur when foundations are designed based upon general guidelines rather than site-specific soil information, such as in the case of some residential construction projects.
[edit] Poor compaction
The leveling of a site prior to foundations being constructed often relies upon the placement of fill soils. Often these are imported from off-site locations and unless they are properly placed and compacted, may compress under loading and result in settlement of the structure.
[edit] Changes in moisture content
The soil’s ability to support the load of a foundation settlement may be reduced by changes in moisture content within the soil. If soils are saturated, clays and silts may be softened. If soils are dried-out they have a tendency to shrink or contract.
[edit] Maturing trees and vegetation
Therefore, a common cause of settlement is root systems expanding from maturing trees and vegetation and drawing soil moisture from beneath a structure. A general rule is that the diameter of a tree’s root system is at least as large as its canopy.
[edit] Soil consolidation
Applied loads force water out of clay soils which compress and result in downward movement or settlement of overlying structures. Settlement caused by consolidation may take a considerable amount of time to be ‘complete’.
[edit] Signs of settlement
In cases of minor settlement, which could be due to cyclic or seasonal movement, small hairline cracks may appear in plaster. In more serious cases, doors and windows may develop sticking problems, and plumbing and mechanical equipment may be adversely affected.
It is rare for settlement to affect the structure of the building. Whilst situations vary from site to site, a general rule is that a crack is considered to be of a structural nature if it approaches or exceeds a width of one-quarter inch.
[edit] Responding to settlement
There are certain steps that may be taken to prepare for, and respond adequately to, settlement:
- Site investigations can be undertaken to try and find out how much settlement is likely and the potential effect on buildings.
- Actual ground and building movement can be measured.
- The existing conditions of buildings and how they may be impacted by further settlement can be assessed.
- Footings may be designed to spread loads over weak soils, reducing potential foundation settlement.
- Compensation grouting can be used to treat ground. This technique is a commonly-used on tunneling projects, where grout is injected into the ground to firm up the area of settlement.
[edit] Related articles on Designing Buildings Wiki
- Bearing capacity.
- Brownfield land.
- Building on fill.
- Cracking and building movement.
- Defects in brickwork.
- Defects in construction.
- Defects in stonework.
- Driven piles.
- Foundations.
- Ground conditions.
- Ground heave.
- Ground improvement techniques.
- Groundworks.
- Latent defects.
- Lateral loads.
- Leaning Tower of Pisa.
- Movement joint.
- Remedial works.
- Spalling.
- Subsidence.
- Types of structural load.
- Underpinning.
[edit] External references
Featured articles and news
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.