Set point
In the construction industry, the term ‘set point’ (or sometimes set-point or setpoint) typically refers to the point at which a building system is set to activate or deactivate.
For example, a heating system might be set to switch on if the internal temperature falls below 20°C, an extract fan might be set to switch on if the relative humidity in a room exceeds 65% and so on.
Set points can be fixed, adjustable or variable. An adjustable set point might be controlled for example by a manually-operated thermostat. A variable set point might be controlled by some form of calculation, for example, set points for air conditioning systems may be programmed to be higher when outdoor temperatures are higher as people are more conditioned to, and dressed for those higher temperatures. Alternatively, if a building is unoccupied, the set point for the heating might be programmed to reduce to just 5°C to prevent pipework from freezing.
The set point at which something is activated may be different from the set point at which it is de-activated. This prevents continually switching on and off if the conditions are very close to the set point.
Set points may be fine-tuned during the commissioning process, and building occupants may be given control of some set points, perhaps within prescribed parameters.
Set points should be monitored, and checked regularly to ensure that they are correctly set and that they are delivering the required result. Seemingly small changes in set points can have a significant impact on performance and energy use. In addition, some building spaces may house critical operations requiring very specific, closely-controlled set points.
It is important therefore that building operators and occupants are provided with an explanation of set points, their operating ranges, and the impact of adjustments on performance and energy use.
NB Guide to Controls (BG 83/2023) written by John Marrow and published by BSRIA in June 2023, defines setpoint as: ‘An adjustable level of a parameter, such as temperature, humidity or pressure, which a control system aims to achieve.’
[edit] Related articles on Designing Buildings
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.