Set point
In the construction industry, the term ‘set point’ (or sometimes set-point or setpoint) typically refers to the point at which a building system is set to activate or deactivate.
For example, a heating system might be set to switch on if the internal temperature falls below 20°C, an extract fan might be set to switch on if the relative humidity in a room exceeds 65% and so on.
Set points can be fixed, adjustable or variable. An adjustable set point might be controlled for example by a manually-operated thermostat. A variable set point might be controlled by some form of calculation, for example, set points for air conditioning systems may be programmed to be higher when outdoor temperatures are higher as people are more conditioned to, and dressed for those higher temperatures. Alternatively, if a building is unoccupied, the set point for the heating might be programmed to reduce to just 5°C to prevent pipework from freezing.
The set point at which something is activated may be different from the set point at which it is de-activated. This prevents continually switching on and off if the conditions are very close to the set point.
Set points may be fine-tuned during the commissioning process, and building occupants may be given control of some set points, perhaps within prescribed parameters.
Set points should be monitored, and checked regularly to ensure that they are correctly set and that they are delivering the required result. Seemingly small changes in set points can have a significant impact on performance and energy use. In addition, some building spaces may house critical operations requiring very specific, closely-controlled set points.
It is important therefore that building operators and occupants are provided with an explanation of set points, their operating ranges, and the impact of adjustments on performance and energy use.
NB Guide to Controls (BG 83/2023) written by John Marrow and published by BSRIA in June 2023, defines setpoint as: ‘An adjustable level of a parameter, such as temperature, humidity or pressure, which a control system aims to achieve.’
[edit] Related articles on Designing Buildings
Featured articles and news
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.