Self-build home: Confirm appointment of the supplier to fabricate and install the kit house
As the kit house supplier has already been selected, this appointment should be a relatively straight-forward process of confirming the purchase and agreeing the programme for the works.
However, it is important to be certain what is included in the contract and what may need to be procured separately, such as:
- Providing appropriate services to the site (water, electricity, gas, telephone, drainage and so on).
- Providing a foundation slab.
- Fitting out the interior.
- Landscaping the site and providing access to the house (this might include; paths, drives, ramps, steps and so on).
Some of these works will be required before the kit house can be installed. Any works that remain outside the main contract will have to be carefully co-ordinated to ensure the programme is properly synchronised and there are no delays. See Appoint a range of contractors and suppliers to construct the home for more information about organising separate trade contractors and suppliers.
The supply contract for the kit house should include information about:
- Start and completion dates and key dates for works outside the contract.
- Stage payments.
- Professional indemnity insurance, public liability insurance and works insurance.
- Warranties. Both for the fabric of the building and any fixtures and fittings.
- Toolkits and operating and maintenance manuals.
- Spares.
- The fixtures and fittings included; such as lamps, blinds, white goods, cupboards, floor coverings, security systems and so on.
- Other specific inclusions and exclusions.
- Certificates.
NB Kit houses may qualify to reclaim the VAT paid on eligible building materials and services. See VAT refunds on self-build homes for more information.
NB Self-build clients are ‘domestic clients’ for the purposes of the Construction (Design and Management) Regulations (health and safety regulations generally referred to as the 'CDM Regulations'), and so the client's duties under the regulations will fall to the contractor on a project where there is only one contractor or to the principal contractor on a project where there is more than one contractor. However self-build clients can attract health and safety duties under Part 4 of the Regulations if they control the way in which construction work is carried out. See CDM for self-builders and domestic clients for more information.
Featured articles and news
Listed despite problems with its design.
Zen and the art of cycling exploration.
Design Council Homes Taskforce launched
To support government 1.5 million homes target within UK climate commitments.
The story of this knowledge quarter building.
In ecology, in hydrology, in biology and in architecture.
Creating environments that promote physical, mental, and social well-being.
UK cases of neutral current diversion
Research project looks for example contributions.
Overstocking and macro-economics cause a decline.
The 2024 update of the Common Assessment Standard
Demonstrating organisational capability’ to fulfil roles under the Building Safety Act.
56 recommendations for a better built environment
Published by the CIC ahead of the King’s Speech.
SkillELECTRIC Top 8 Competitors Named
in annual search for the UK’s best student electrician.
CIOB Diversity and Inclusion technical information sheet
Step-by-step guide on implementing D and I practices.
Conservation and the Indian City. Book review.
Reversibility in conservation ethics
Learning from painting conservation.
Where It's AT Podcast launched!
New CIAT Architectural Technology Podcast goes live.