Section 63 assessment
It has become mandatory for commercial landowners in Scotland to undertake a Section 63 assessment to comply with energy efficiency requirements for domestic buildings of more than 1000m² with eligibility for an EPC (Energy Performance Certificate) for rent or sale.
Buildings that meet energy standards equivalent to those introduced by the 2002 building regulations or are already improved via a Green Deal are exempted from the regulations.
The assessment results in the production of an action plan setting targets for enhancing the carbon and energy performance of the building and how these targets could be met through physical improvements to the property.
An action plan may contains measures such as lighting controls upgrade, low energy lighting improvements, boiler replacement, heating controls enhancement, installation of draught stripping to windows and doors, insulation installation and so on.
Action plans are submitted in the EPC register and the owners have to make these details available to prospective tenants or buyers.
Once the targets and measures are finalised, they should be implemented or carried out within 42 months of the action plan. If the building owner does not complete the improvement measures within this time, a DEC certificate must be produced on a yearly basis until all the improvements are implemented. If the building owner completes the improvements within 42 months, a fresh action plan and EPC are created and submitted. This step proves that the property owner has done everything to meet the regulation requirements.
If a property owner fails to produce an action plan while selling or renting the property or does not perform or complete the enhancement works within the stipulated time frame; they may be liable to pay a fine for each failure.
Action plans are produced by persons registered as section 63 advisors, who have demonstrated competence in the assessment procedure and the provision of improvement advice to building owners.
Local authorities and the Scottish government monitor the energy improvement data collection and if they identify that the energy improvement measures do not meet the expected standards, property owners will be asked to perform retrofit works prescribed in the regulations.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
About the 5 Percent Club and its members
The 5% Club; a dynamic movement of employers committed to building and developing the workforce.
New Homes in New Ways at the Building Centre
Accelerating the supply of new homes with MMC.
Quality Planning for Micro and Small to Medium Sized Enterprises
A CIOB Academy Technical Information sheet.
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.