Feed-in tariff FIT
Our society is heavily dependent on fossil fuels such as oil, gas and coal, and is likely to remain dependent on them for much of this century. Every year we emit more than 20 billion tonnes of carbon into the atmosphere by burning fossil fuels, half of which is absorbed in the seas and by vegetation, and half of which remains in the atmosphere.
The impact on human and natural systems is potentially irreparable. In addition, as fuels deplete and demand increases, so supplies become more vulnerable to disruption.
The feed-in tariff scheme was introduced by the Government's Department for Energy and Climate Change (DECC) on 1 April 2010. Consumers who generate their own electricity from a renewable or low-carbon source can qualify for a payment (‘Feed-in Tariff’ (FIT)) for each unit of electricity generated.
Allowable technologies are:
- Solar photovoltaic panels.
- Wind turbines.
- Water turbines.
- Anaerobic digestion (biogas energy).
- Micro combined heat and power (micro-CHP).
The installation must have a peak output of no more than 5 megawatts (MW) and must be installed by a certified installer.
The feed-in tariff rate varies depending on:
- The size of the system.
- The generating technology.
- The installation date.
Consumers can also qualify for an ‘export tariff’ by selling surplus electricity back to their supplier. This is estimated as being 50% of the electricity generated for most domestic systems.
The tariffs paid depend on the eligibility date, and for solar photovoltaic panels, if the property’s energy performance certificate (EPC) rating is below ‘D’, then either additional energy saving measures must be taken before solar photovoltaic panels are installed, or a lower tariff will be paid.
Tables showing the latest tariffs are available on the Ofgem website.
NB: On 9 September 2015, following consultation, the government announced that they would remove pre-accreditation for all new participants in the Feed-in Tariff scheme from 01 October. Pre-accreditation allows a developer to lock in the subsidy rate well before major construction work or installation to acquire the necessary planning and environmental permits and grid connections has been completed.
This means that although the subsidy level may have reduced by the time electricity begins to be generated, the developer will receive the higher subsidy agreed when the plant was in the planning stage. Ref gov.uk.
NB: On 31 March 2019, the United Kingdom's Feed-in tariff was discontinued for new applicants. See Smart Export Guarantee SEG.
[edit] Related articles on Designing Buildings
- CHP.
- Domestic micro-generation.
- Electricity supply.
- Energy performance certificates.
- Energy storage - the missing piece?
- Geothermal piles.
- Green deal.
- Green Deal Home Improvement Fund.
- Ground energy options.
- Ground source heat pumps.
- Large scale solar thermal energy.
- Making the most of renewable energy systems DG 531.
- Microgeneration.
- Microgeneration certification scheme.
- Microgeneration Certification Scheme 2020.
- Micro-CHP.
- Micro-grid.
- On site.
- Private wire arrangement.
- PV inverter.
- Renewable energy.
- Renewable heat incentive.
- Smart Export Guarantee SEG.
- Solar photovoltaics
- Solar thermal systems.
- Wind Energy in the United Kingdom
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.