Feed-in tariff FIT
Our society is heavily dependent on fossil fuels such as oil, gas and coal, and is likely to remain dependent on them for much of this century. Every year we emit more than 20 billion tonnes of carbon into the atmosphere by burning fossil fuels, half of which is absorbed in the seas and by vegetation, and half of which remains in the atmosphere.
The impact on human and natural systems is potentially irreparable. In addition, as fuels deplete and demand increases, so supplies become more vulnerable to disruption.
The feed-in tariff scheme was introduced by the Government's Department for Energy and Climate Change (DECC) on 1 April 2010. Consumers who generate their own electricity from a renewable or low-carbon source can qualify for a payment (‘Feed-in Tariff’ (FIT)) for each unit of electricity generated.
Allowable technologies are:
- Solar photovoltaic panels.
- Wind turbines.
- Water turbines.
- Anaerobic digestion (biogas energy).
- Micro combined heat and power (micro-CHP).
The installation must have a peak output of no more than 5 megawatts (MW) and must be installed by a certified installer.
The feed-in tariff rate varies depending on:
- The size of the system.
- The generating technology.
- The installation date.
Consumers can also qualify for an ‘export tariff’ by selling surplus electricity back to their supplier. This is estimated as being 50% of the electricity generated for most domestic systems.
The tariffs paid depend on the eligibility date, and for solar photovoltaic panels, if the property’s energy performance certificate (EPC) rating is below ‘D’, then either additional energy saving measures must be taken before solar photovoltaic panels are installed, or a lower tariff will be paid.
Tables showing the latest tariffs are available on the Ofgem website.
NB: On 9 September 2015, following consultation, the government announced that they would remove pre-accreditation for all new participants in the Feed-in Tariff scheme from 01 October. Pre-accreditation allows a developer to lock in the subsidy rate well before major construction work or installation to acquire the necessary planning and environmental permits and grid connections has been completed.
This means that although the subsidy level may have reduced by the time electricity begins to be generated, the developer will receive the higher subsidy agreed when the plant was in the planning stage. Ref gov.uk.
NB: On 31 March 2019, the United Kingdom's Feed-in tariff was discontinued for new applicants. See Smart Export Guarantee SEG.
[edit] Related articles on Designing Buildings
- CHP.
- Domestic micro-generation.
- Electricity supply.
- Energy performance certificates.
- Energy storage - the missing piece?
- Geothermal piles.
- Green deal.
- Green Deal Home Improvement Fund.
- Ground energy options.
- Ground source heat pumps.
- Large scale solar thermal energy.
- Making the most of renewable energy systems DG 531.
- Microgeneration.
- Microgeneration certification scheme.
- Microgeneration Certification Scheme 2020.
- Micro-CHP.
- Micro-grid.
- On site.
- Private wire arrangement.
- PV inverter.
- Renewable energy.
- Renewable heat incentive.
- Smart Export Guarantee SEG.
- Solar photovoltaics
- Solar thermal systems.
- Wind Energy in the United Kingdom
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.