Screening decision for environmental impact assessment
A screening decision (or screening opinion) is the process of determining whether an environmental impact assessment is required as part of a planning application.
Environmental impact assessments are required for developments described in schedule 1 and schedule 2 of The Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations. This includes projects such as:
- Power stations, refineries, certain industrial processes, certain transport projects, dams, pipelines and airports.
- Major projects (above certain thresholds) described in the schedules of the regulations.
- Developments in sensitive or vulnerable locations (thresholds do not apply in sensitive locations such as national parks or national nature reserves where every project must be screened for environmental impact assessment).
- Unusually complex projects that may have adverse environmental effects.
See Environmental Impact Assessment for more information.
If the applicant is uncertain about whether an environmental impact assessment is required they can ask for a formal opinion from the local planning authority. Alternatively, if an application is made without an environmental impact assessment, the local planning authority may adopt a screening opinion themselves.
A request for a screening opinion should contain:
- A location plan.
- A description of the project
- A description of the potential environmental effects of the project.
- Other relevant information.
The local planning authority then has 3 weeks to adopt a screening opinion, unless a longer period has been agreed with the applicant. If the local planning authority does not take a screening opinion, or if the applicant disagrees with the opinion, they may appeal to the Secretary of State who will then make a screening direction.
NB On 31 July 2014, Brandon Lewis, newly-appointed Minister of State for Housing and Planning at the Department for Communities and Local Government, announced proposals to remove the “unnecessary gold-plating” introduced by EU directives which slow down the process, by reducing the numbers of homes and other urban development proposals that would be screened unnecessarily for environmental impact assessments. Ref DCLG, Making the planning system work more efficiently and effectively, Giving communities more power in planning local development, 31 July 2014.
In April 2015, the Town and Country Planning (Environmental Impact Assessments)(Amendment) Regulations 2015 came into effect, raising the threshold above which a screening decision is required to determine whether an environmental statement is necessary, as set out in the Town and Country Planning (Environmental Impact Assessment) Regulations 2011. Controversially, this raised the threshold for industrial estates, residential developments and other urban developments from 0.5 hectares to five hectares (or 150 units for residential developments).
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
A dynamic brand built for impact stitched into BSRIA’s building fabric.