The Priority Schools Building Programme (PSBP) was established in 2011 to address the needs of those schools in the worst condition that required urgent repair. The programme is centrally managed and procured by the Education & Skills Funding Agency (ESFA), an executive agency, sponsored by the Department for Education (DFE).
Making sure schools are high quality and positive environments is a key part of the government’s long-term vision for education. There is a general belief that better schools help build a fairer society and a better economy. The intention of the Priority Schools Building Programme is to undertake school rebuilding and refurbishment projects to improve the overall standard of school buildings by creating classrooms which are conducive to learning and providing access to world-class facilities for pupils and teachers.
The programme covers primary, secondary and special education needs (SEN) schools. The list of 261 schools that were successful in the first phase of the programme was announced in May 2012, covering schools due to be wholly or substantially rebuilt by 2017. 215 of these schools are being delivered by capital grant funding and 46 schools via private finance funding.
Schools in the programme are spread across England and have been grouped together in batches by taking consideration of condition, need, commercial viability and geography.
A number of consultants have been appointed to deliver the PSBP and many contractors submitted bids to secure the construction contracts, as well as ongoing maintenance contracts. Companies listed on the EFA contractors framework were invited to bid for each of the capital batches. The bids were reviewed and evaluated and 2 contractors shortlisted. Following a further period of competition the successful contractors were appointed.
As of 26 January 2015, 16 schools had been completed and 55 schools were under construction. The remaining projects were deep into the planning or development stages.
The government believes that schools are being developed much faster and cheaper under the PSBP than those developed under the previous school building initiative, Building Schools for the Future (BSF). It took around 3 years for construction work to begin under the BSF, whereas under the PSBP this has been reduced to 1 year. PSBP projects are thought to have cost around a third less.
In May 2014 the government announced a further £2 billion for a second phase, PSBP2, which will undertake rebuilding and refurbishment projects across 277 schools from 2015 to 2021. In February 2015, an extra £4 billion was allocated between 2015 and 2018. Deputy Prime Minister Nick Clegg said, “...it is crucial that we invest in education, so that every child has a fair start in life”. Ref Gov.uk, £6 billion investment to rebuild and improve schools across England, 9 February 2015.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Baseline designs for schools.
- Building Bulletin 93: acoustic design of schools
- Building Schools for the Future.
- Free schools.
- House of Commons, Treasury - Seventeenth Report: Private Finance Initiative.
- Independent Client Advisers.
- Major Projects Authority.
- OGC.
- PF2
- PFI
- Public private partnership
- Public procurement.
- RIBA client adviser.
Featured articles and news
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.