Priority School Building Programme PSBP
The Priority Schools Building Programme (PSBP) was established in 2011 to address the needs of those schools in the worst condition that required urgent repair. The programme is centrally managed and procured by the Education & Skills Funding Agency (ESFA), an executive agency, sponsored by the Department for Education (DFE).
Making sure schools are high quality and positive environments is a key part of the government’s long-term vision for education. There is a general belief that better schools help build a fairer society and a better economy. The intention of the Priority Schools Building Programme is to undertake school rebuilding and refurbishment projects to improve the overall standard of school buildings by creating classrooms which are conducive to learning and providing access to world-class facilities for pupils and teachers.
The programme covers primary, secondary and special education needs (SEN) schools. The list of 261 schools that were successful in the first phase of the programme was announced in May 2012, covering schools due to be wholly or substantially rebuilt by 2017. 215 of these schools are being delivered by capital grant funding and 46 schools via private finance funding.
Schools in the programme are spread across England and have been grouped together in batches by taking consideration of condition, need, commercial viability and geography.
A number of consultants have been appointed to deliver the PSBP and many contractors submitted bids to secure the construction contracts, as well as ongoing maintenance contracts. Companies listed on the EFA contractors framework were invited to bid for each of the capital batches. The bids were reviewed and evaluated and 2 contractors shortlisted. Following a further period of competition the successful contractors were appointed.
As of 26 January 2015, 16 schools had been completed and 55 schools were under construction. The remaining projects were deep into the planning or development stages.
The government believes that schools are being developed much faster and cheaper under the PSBP than those developed under the previous school building initiative, Building Schools for the Future (BSF). It took around 3 years for construction work to begin under the BSF, whereas under the PSBP this has been reduced to 1 year. PSBP projects are thought to have cost around a third less.
In May 2014 the government announced a further £2 billion for a second phase, PSBP2, which will undertake rebuilding and refurbishment projects across 277 schools from 2015 to 2021. In February 2015, an extra £4 billion was allocated between 2015 and 2018. Deputy Prime Minister Nick Clegg said, “...it is crucial that we invest in education, so that every child has a fair start in life”. Ref Gov.uk, £6 billion investment to rebuild and improve schools across England, 9 February 2015.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Baseline designs for schools.
- Building Bulletin 93: acoustic design of schools
- Building Schools for the Future.
- Free schools.
- House of Commons, Treasury - Seventeenth Report: Private Finance Initiative.
- Independent Client Advisers.
- Major Projects Authority.
- OGC.
- PF2
- PFI
- Public private partnership
- Public procurement.
- RIBA client adviser.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.