Applying for new postal addresses
The glossary of statistical terms, published by the Organisation for Economic Co-operation and Development (OECD), defines an address as: ‘A number or similar designation that is assigned to a housing unit, business or any other structure. Addresses mainly serve postal delivery, but are also important for administrative purposes, for example in civil registration systems and in census taking.’
New developments or the conversion of existing premises may result in the need for new postal addresses.
It is important to apply for a postal address as early as possible, ideally, as soon as planning permission has been granted. Utility companies may be reluctant to connect services to properties that do not have official postal addresses, and it may be important to secure addresses for marketing and sales purposes. Obtaining a new postal address may involve naming new roads. This can take time to agree and can cause problems with sales if the process is not begun early enough.
Local authorities have statutory responsibility for naming streets and numbering properties. Applications are generally made to the Local Land and Property Gazetteer (LLPG) team or the Street Naming and Numbering (SNN) team.
A postal address may be applied for by individuals or developers by completing an application form (or sometimes by writing a letter or emailing the local authority) and may need to be accompanied by a drawing showing the extent of the premises, and relevant planning permissions. A fee is chargeable for applications.
The local authority will check there are no similar addresses within the same post code or in a neighbouring area and will consult with the Highways department.
If the application is approved, an approval notice will be sent to the applicant confirming the addresses, with a drawing show any agreed new streets and property numbers. Details will also be issued by the local authority to the emergency services, statutory authorities and the Royal Mail, who are responsible for allocating postcodes.
New addresses are allocated in accordance with British Standard 7666 and are compiled and recorded by the National Land and Property Gazetteer (NLPG).
[edit] Related articles on Designing Buildings
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.