Permit to work (PTW) systems are formal procedures used to control activities that are considered high-risk. Permits only allow authorised personnel to perform those activities at specified times and in a way set out in the permit and referenced documents.
A permit to work might be required for activities such as:
- Electrical works.
- Hot works.
- Excavation.
- Lone working.
- Lifting operations.
- Work in confined spaces.
- Work to high risk spaces such as laboratories, or industrial plant.
- Work at height.
- Work to roofs.
- Temporary works.
- Work with asbestos.
- Demolition.
- Work to high pressure systems.
A permit to work system should:
- Only allow permits to be issued by authorised, competent personnel.
- Prevent high-risk work being carried out without a risk assessment having been undertaken.
- Consider whether any other work will impact on, or be impacted by, the permitted work.
- Ensure control measures and supervision are in place.
- Ensure method statements and emergency procedures are prepared.
- Ensure work is checked and returned to a safe state.
- Provide information to other parties that might be affected by the work.
- Include a system for handing back and cancelling permits.
Permits should:
- Describe the work and its location.
- Provide information about foreseeable risks.
- Provide information necessary for working safely.
- Set out requirements for personal protective equipment.
- Set out the time when the work can be carried out.
- Provide information about other permits.
Issuing permits to work can be a complicated and time-consuming process and so adequate notice should be given before a permit to work is required.
Permit to work systems do not in themselves make activities safer, this is only possible through the implementation of the correct procedures. It is important therefore that systems not box-ticking exercises, that they are explained at site inductions and that they are continuously monitored, reviewed and kept up to date.
NB BG 87/2024, Useful Information Guide, written by Chin Hang “Kay” Lam and published by BSRIA in 2024, defines a Permit-to-Work system as: ‘A documented management system that includes specific processes to record and authorise tasks to be carried out by designated parties, including employees and contractors, so that they are aware of their risks and responsibilities.’
[edit] Related articles on Designing Buildings
- Asbestos.
- CDM.
- Demolition.
- Gangmaster.
- Health and Safety.
- Method statement.
- Permit.
- Personal protective equipment
- Risk assessment.
- Safe2Torch.
- Site induction.
- Site records and registers.
[edit] External references
Featured articles and news
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.
Foundations for the Future: A new model for social housing
To create a social housing pipeline, that reduces the need for continuous government funding.
Mutual Investment Models or MIMs
PPP or PFI, enhanced for public interest by the Welsh Government.
Key points and relevance to construction of meeting, due to reconvene.