Operational expenditure for built assets
Operational expenditure (opex, sometimes referred to as revenue expenditure) is expenditure incurred as a result of the day-to-day operations of a business. Operational expenditure might include expenditure such as; wages, utilities costs, maintenance and repairs, rent, sales, general and administrative expenses.
Operational expenditure is often distinguished form capital expenditure (capex), which is expenditure incurred in the acquisition, construction or enhancement of significant fixed assets including land, buildings and equipment that will be of use or benefit for more than one financial year.
Whilst it is generally relatively straight forward to identify expenditure to acquire or construct fixed assets, distinguishing between enhancements and operational expenditure such as repairs, maintenance, or replacement can be difficult. Very broadly, enhancements should either:
- Significantly lengthen the life of the asset
- Significantly increase the value of the asset.
- Significantly increase usefulness of the asset.
In construction, capex and opex can be considered to be associated with separate, distinct stages, with capital expenditure during acquisition and construction, and then a ‘handover’ to operational expenditure when the client takes possession of the completed development.
Capex and opex can be seen as competing needs, with higher capital expenditure often resulting in lower operational expenditure, as a higher quality asset may have lower maintenance and repair costs, lower utilities costs, and so on. Whilst sometimes the division between capital and operational expenditure can be one of necessity, based on the resources available to the client at the time, it can be based on an assessment of whole-life costs
Whole life costs consider all costs associated with the life of a building including:
- Acquisition.
- Fees
- Construction.
- Insurance, inflation and financing.
- Fixtures, fittings and equipment.
- Relocation.
- Operation.
- Disposal.
Whilst it is often tempting to seek savings in the early stages of a project, the relative benefit of this tends to be outweighed by the long-term impact.
This is sometimes demonstrated by a rough assessment of the typical costs of an office building over 30 years, in the ratio:
- 0.1 to 0.15 for design costs (ref OGC Achieving Excellence Guide 7 - Whole-Life costing).
- 1 for construction costs.
- 5 for maintenance and building operating costs during the lifetime of the building.
- 200 for the cost of operating the business during the lifetime of the building.
(Ref. Report of the Royal Academy of Engineering on The long term costs of owning and using buildings (1998).)
However, this has been criticised as misleading, not least because the construction industry accounts for around 7% of GDP, implying a much more significant proportion of business costs than the ratio suggests. Other ratios of construction costs to operational costs to business costs have suggested figures as low as 1:0.6:6 for some types of buildings. However, the usefulness of these ratios is questionable, other than if they are calculated based on actual figures for specific businesses.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.