NRM3
The New Rules of Measurement (NRM) are published by the Royal Institute of Chartered Surveyors (RICS), prepared by the Quantity Surveying and Construction Professional Group. They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects. Adopting a standard methodology such as NRM facilitates consistency and benchmarking and helps avoid disputes.
NRM is a suite of documents, comprising three volumes:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM2: Detailed measurement for building works (replacing the Standard Method of Measurement, seventh edition SMM7).
- NRM 3: Order of cost estimating and cost planning for building maintenance works.
Together this suite of documents offers a cradle-to-grave approach to cost estimating, works procurement and post-construction procurement.
NRM 3 is intended to provide a consistent method for the quantification and description of maintenance works. It was published in March 2014 and is available from the RICS website.
NRM3 can be used for:
- Initial order of cost estimates during preparation stages.
- Cost plans during the design development and pre-construction stages.
- Asset-specific cost plans during the pre-construction phases.
It also offers guidance about:
- The procurement and cost control of maintenance works.
- The measurement of other items associated with maintenance works that are not included in work items.
The rules for NRM3 follow the same framework and premise as NRM1: Order of cost estimating and cost planning for capital building works.
NB The New Rules of Measurement are accompanied by the 'Black Book', the QS and construction standards. Together they provide a suite of tools that will help the construction industry work more collaboratively and consistently.
[edit] Related articles on Designing Buildings Wiki
- Bill of quantities.
- Common Arrangement of Work Sections (CAWS).
- Comparison of SMM7 with NRM2.
- Cost plans.
- External works.
- Measurement.
- New Rules of Measurement.
- NRM1.
- NRM2.
- Schedule of work.
- Standard Method of Measurement (SMM7).
- Tender.
- Tender documentation.
- Uniclass.
[edit] External references
Featured articles and news
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.
Comments
err... WHERE is it?
http://www.rics.org/uk/shop/NRM-3-Order-of-cost-estimating-and-cost-planning-for-building-maintenance-works-19866.aspx