Most Economically Advantageous Tender (MEAT)
[edit] Introduction
The Most Economically Advantageous Tender (MEAT) is a method of assessment that can be used as the selection procedure, allowing the contracting party to award the contract based on aspects of the tender submission other than just price.
MEAT was introduced by the European Parliament in January 2014. The European Union Procurement Directives established public procurement rules that apply to any public purchases above defined thresholds, and these are enacted in the UK by The Public Contracts Regulations.
The ‘alternative’ criteria which can be used in a MEAT assessment include:
- Quality.
- Price or cost using a cost-effectiveness approach.
- Technical merit.
- Aesthetic and functional characteristics.
- Accessibility.
- Social characteristics.
- Environmental characteristics.
- Innovative characteristics.
- After-sales service and technical assistance.
- Delivery conditions such as date, process and period.
Each of the criteria used is given a relative weighting, which must be set out in the tender documents. Alternatively, they can be listed in descending order of importance.
The rules stipulate that the contract notice must make clear to tenderers that the MEAT criteria will be used to judge their submission. The criteria cannot then be changed.
A two-stage process of tender evaluation can then be used. The first stage is a technical evaluation which uses individual weighted criteria to assess the technical merit of the tenders. The second stage is a financial evaluation which calculates the relative cost of each tender compared to the lowest price offered. Finally, the tenders are ranked based on the aggregate score of both stages.
[edit] Post Brexit reform
On 15 December 2020, the Green Paper Transforming Public Procurement was presented to Parliament by the Cabinet Office and Lord Agnew, the Minister of State for Efficiency and Transformation. The paper proposed several changes to procurement policy in the UK to reflect the country’s post-Brexit status.
During the UK’s membership of the EU, MEAT public procurement rules applied to any public purchases above defined thresholds and were overseen in the UK by the Public Contracts Regulations (PCR). Post-Brexit recommendations in the Transforming Public Procurement green paper proposed the replacement of MEAT procurement rules with MAT, essentially removing the ‘economic’ component from the method of assessment.
The thought process behind this modification was the idea that ‘economic’ could sometimes be interpreted simply as lowest price. Under MEAT, evaluating certain economic factors (such as quality) was seen as complex and potentially restrictive.
For more information see: Most advantageous tender.
[edit] Related articles on Designing Buildings
Featured articles and news
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Comments