Loft v attic
The terms 'loft' and 'attic' are often used interchangeably to describe a large void under, or partly under a roof, but above the main occupied spaces, that it is possible to access.
However, some definitions suggest that the term ‘attic’ refers to the entire storey of a building under the roof, whereas the term ‘loft’ refers to one or more rooms or spaces under the roof, but not the entire storey.
The difference between a loft room and an attic room is sometimes explained as:
- A loft room is accessed by a fixed staircase and has the whole loft area converted to a living space including the sloped eaves if the property has a pitched roof.
- An attic room is accessed by a fixed staircase and has the eaves area of the loft squared off to create a box room in the centre.
The term attic derives from the low decorative columns that often appear in the top storey of a building above the main façade in classical architecture. It was then adopted to refer to any decorative facade above the main story of a building, and subsequently, the space enclosed by such a facade.
The word 'loft' is thought to derive from Old Norse word 'lopt', meaning the upper chamber, upper region or sky, similar to the Old High German word 'luft', meaning air.
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February