Local listed building consent order
The designation of ‘listed building’ places special controls on the demolition, alteration or extension of buildings, objects or structures of particular architectural or historic interest. Demolition, alteration or extension of a listed building in a way that is likely to affect its special architectural or historical interest is only allowed with listed building consent.
Local planning authorities can grant Local Listed Building Consent Orders which grant a general listed building consent order for works that alter or extend certain listed buildings in their area (demolition works are not included). This means that owners or developers do not need to apply for repeat listed building consent for works that are covered by the order. They are likely to be used for groups of similar or related listed buildings in multiple ownership, for example, estate villages or terraced houses.
This is different to a Listed Building Heritage Partnership Agreement (LBHPA), which is an agreement between a local planning authority and the owner of a listed building, or group of buildings, which grants listed building consent for types of works (alterations or extensions) to the building(s) for the duration of the agreement.
The duration of a Local Listed Building Consent Order is determined by the local planning authority. Within the Order, the land and buildings to which the Order relates is defined along with details of what type of works are covered. It is recommended that a record (written and photographic) is kept of any works undertaken to assist the local planning authority with monitoring the Order.
Under the Planning (Local Listed Building Consent Orders) (Procedure) Regulations 2014, owners and any other interested parties must be provided with an opportunity to comment on a draft Order. The consultation period will be for a minimum of 28 days. Historic England (formerly English Heritage) must also be consulted on any draft Order relating to Grade I or II* buildings, or any building that is owned by the local planning authority.
Once the Order is adopted, it is recommended that regular reviews are undertaken to ensure that it remains fit for purpose. The local planning authority must prepare annual reports whilst the order is in place.
[edit] Related articles on Designing Buildings
- Are works to listed buildings demolition or alteration?
- Historic England.
- IHBC responds to Review of the Mission and Pastoral Measure 2011.
- Listed building.
- Listed building consent order.
- Listed building heritage partnership agreement.
- Locally listed building.
- Mission and Pastoral Measure 2011.
- Planning permission.
- Port Sunlight's local listed building order.
[edit] External references
Featured articles and news
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.
ECA shares advice for those who may be exposed to risks.
How to revolutionise UK housing with MMC
CIC and Supply Chain Sustainability School unveil a plan.
From the UKs largest manufacturer and supplier of lime.
From mud bricks to smart concrete
A brief history from 7000BC to a future on the moon.
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
New Floods Resilience Taskforce
With a wet met office autumn prediction.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.