Landings are level platforms found at the top or bottom of flights of stairs. Intermediate landings may be found part way up flights of stairs where there is an intermediate level, where there is a change in direction of the flight of stairs, or where there is a long flight of stairs.
Approved document K protection from falling, collision and impact, requires that there is a landing at the top and bottom of every flight, with a width and length at least as great as the smallest width of the flight of stairs.
Landings should be clear of permanent obstructions. They may have doors to cupboards or ducts that open over them, but these should remain closed in normal use. Other doors may swing across landings in dwellings, but only as shown below.
A headroom of at least 2m should be provided on all landings.
Where there are more than 36 risers in consecutive flights of stairs, Approved Document K requires that there is at least one change of direction, with a landing that has a minimum length equal to the width of the stairs. Landings in building other than dwellings should be at least 1200mm long.
For buildings other than dwellings, the maximum number of risers should be 16 for utility stairs, and 12 for general access stairs (or 16 in exceptional circumstances where the plan area is restricted). Landings in buildings other than dwellings should have suitable handrails on each side.
Landings may also be found at the top, bottom and along the length of ramps. They must be at least as long as the width of the ramp. For buildings other than dwellings, they must be at least 1200mm long at the top and bottom of the ramp, and at least 1500mm long for intermediate landings.
Approved Document M sets out additional guidance and requires the provision of landings as rest areas for wheelchair users and people with walking difficulties, and to provide space for wheelchair users to stop and open doors.
Approved Document M also refers to landings in front of lifts.
Approved Document B sets our additional requirements in relation to fire safety.
NB see also: Soft landings.
[edit] Related articles on Designing Buildings Wiki
- Ancillary area.
- Approved Document B.
- Approved Document K.
- Approved Document M.
- Banister.
- Building regulations.
- Escalator.
- Finial.
- Flight.
- Guarding.
- Intermediate landing.
- Lifts.
- Lobby.
- Maximum length of a flight of stairs.
- Newel post.
- Railings.
- Ramps.
- Spiral stairs and helical stairs.
- Stairs.
- Stairs going.
- Stairs nosing.
- Stairs riser.
- Stairs string.
- Stairs tread.
- Stairlift.
- Types of stairs.
- Wheelchair platform stairlifts.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February